Operations Update

7 Apr 2020 07:00

RNS Number : 9813I
88 Energy Limited
07 April 2020
 

7th April 2020

 

This announcement contains inside information

 

88 Energy Limited

 

Charlie-1 Confirms Large Condensate Discovery in Torok Formation

 

88 Energy Limited ("88 Energy" or the "Company", ASX:88E, AIM 88E) provides the following update related to operations for the Charlie-1 appraisal well, on the North Slope of Alaska.

 

Highlights

· Condensate discovery confirmed in Torok Formation

· Economic review underway to assess commerciality

 

Detail

88 Energy confirms that the Charlie-1 appraisal well has proved the presence of mobile hydrocarbons, in the form of condensate gas, in the Torok Formation in both the Middle Stellar and Lower Stellar targets. Hydrocarbons were successfully recovered to surface from both targets using a state-of-the-art downhole sampling tool (Ora). Further analysis to confirm the composition and gas to liquid ratio will now be undertaken. Upper Stellar was not tested due to the sub optimal location that it was intersected by the well.

 

Sampling was also successfully completed in the Schrader Bluffs Formation from the Indigo target, which was found to be water bearing. The Charlie target was found to be poorly developed and was not sampled. Oil shows in this interval are deemed to be related to residual oil that is not trapped in the system.

 

In the Seabee Formation, an attempt was made to take a sample from the Lower Lima target, being the better of the two Lima targets. This attempt was unsuccessful due to insufficient reservoir quality; however, given that these targets were not intersected optimally, there still may be potential for higher quality reservoir at a different location. Excellent Vertical Seismic Profile ("VSP") data was obtained in the well, which will now be used in conjunction with other log data and the existing 3D seismic, to remap these targets. Sidewall core analysis will also assist with determining where improved reservoir is likely to exist. Mud gas, observed while drilling, in the Seabee indicated that the hydrocarbons at this horizon are heavier than those in the Torok and this is the horizon where "live oil" was observed across the shakers in the nearby Malguk-1 well.

 

Detailed logs and sidewall cores were also acquired in the HRZ formation, which will now be analysed over the coming months. The HRZ remains a viable target and options to commercialise this potentially large resource continue to be pursued.

 

Premier has informed the Joint Venture that it intends to withdraw from the project, as the well did not meet its pre-drill expectations.

 

The cost of the well remains within the expected budget and 88E does not expect to incur any costs in relation to the drilling.

 

The well will now be plugged and abandoned ("P&A") in line with standard industry practice. The decision to P&A the well instead of moving to suspension or testing was made for a number of reasons:

· Further analysis is required to determine whether a discovery of this nature can be commercialised on the North Slope, given the likely high gas content

· An optimum stimulation and test at this juncture is not possible in the timeframe required due to the different phase of the hydrocarbons encountered and the length of season remaining

· Uncertain access to various personnel that may be required in the event of unforeseen circumstances/emergency situations, in light of the COVID-19 pandemic

· The lateness of the season and exposure to potential early break-up, which could result in the rig being stranded on the wrong side of the Kuparuk River at significant cost

· Reluctance to create a potential future liability if analysis determines that the well should be P&A'd in a subsequent season, at substantially higher cost

 

 

Managing Director of 88 Energy, Dave Wall, stated: "Charlie-1 has delivered a mixed result. On the one hand, we have confirmed the presence of mobile hydrocarbons in the primary targets of the well but, at the same time, there are challenges that need to be more fully understood related to whether these can be commercialised on the North Slope. Samples of the hydrocarbons have been recovered to surface and will now be the subject of further analysis in the coming months.

 

The risks related to the shallower targets have unfortunately been borne out, with one found to be water bearing and the other to have no sand development.

 

The Lima targets both remain valid and, using the VSP, logs and cores from Charlie-1, we hope to be able to enhance the prospectivity of the Seabee Formation on our acreage.

 

We also hope to glean valuable information in regard to the HRZ potential in this area of Project Icewine and analysis will take place over the next few months.

 

Further details will be released as the required analyses from Charlie-1 are completed."

 

Reporting requirements under LR 5.30

The Charlie-1 well is located on the North Slope of Alaska, ADL 393380, where 88 Energy has a 30% working interest. The well penetrated sandstones in seven stacked targets and shale in one target. No flow tests were undertaken; however, gas condensate samples were retrieved to surface from the Torok formation at 10,506' and 10,656' using a downhole sampling tool (Ora) run during the wireline operation.

 

This announcement has been authorised by the Board.

 

Media and Investor Relations:

 

88 Energy Ltd

Dave Wall, Managing Director Tel: +61 8 9485 0990

 Email: admin@88energy.com 

 

Finlay Thomson, Investor Relations Tel: +44 7976 248471

 

Hartleys Ltd

Dale Bryan Tel: + 61 8 9268 2829

 

Cenkos Securities Tel: + 44 131 220 6939

Neil McDonald/Derrick Lee

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDFFFSISVIRIII
Date   Source Headline
27th Nov 20177:00 amRNSCorporate Presentation
25th Oct 20177:00 amRNSProject Icewine Lease Award Update
10th Oct 20177:03 amRNSQuarterly Report
2nd Oct 20177:00 amRNSCorporate Presentation
21st Sep 201711:05 amRNSSecond Price Monitoring Extn
21st Sep 201711:00 amRNSPrice Monitoring Extension
21st Sep 20177:06 amRNSProject Icewine Operations Update
12th Sep 20177:00 amRNSProject Icewine Operations Update
4th Sep 20177:00 amRNSProject Icewine Operations Update
24th Aug 20177:00 amRNSProject Icewine Operations Update
17th Aug 20177:00 amRNSProject Icewine Operations Update
4th Aug 201710:24 amRNSInterim Report
19th Jul 20177:00 amRNSQuarterly Report
18th Jul 20177:00 amRNSIcewine#2 Operations Update
10th Jul 20179:05 amRNSSecond Price Monitoring Extn
10th Jul 20179:00 amRNSPrice Monitoring Extension
10th Jul 20177:00 amRNSIcewine#2 Operations Update
4th Jul 20177:29 amRNSIssue of Equity
4th Jul 20177:00 amRNSIcewine#2 Operations Update
26th Jun 201711:05 amRNSSecond Price Monitoring Extn
26th Jun 201711:00 amRNSPrice Monitoring Extension
26th Jun 20177:00 amPRNOperations Update
21st Jun 20179:40 amRNSIssue of Equity
20th Jun 20177:30 amRNSIcewine#2 Operations Update
19th Jun 20174:41 pmRNSIssue of Equity
19th Jun 20178:00 amRNSIcewine#2 Operations Update
16th Jun 20178:54 amRNSIssue of Equity
13th Jun 20178:00 amRNSIcewine#2 Operations Update
6th Jun 20174:40 pmRNSSecond Price Monitoring Extn
6th Jun 20174:35 pmRNSPrice Monitoring Extension
6th Jun 20177:00 amRNSIcewine#2 Operations Update
30th May 20177:00 amRNSIcewine#2 Operations Update
22nd May 20177:00 amRNSIcewine#2 Operations Update
17th May 20177:00 amRNSIcewine#2 Total Depth Reached
9th May 20178:31 amRNSIcewine#2 Drilling Remains on Schedule
3rd May 20177:00 amRNSIcewine#2 Drilling on Schedule
25th Apr 20177:29 amRNSIcewine#2 Drilling Commenced
7th Apr 20179:00 amRNSIcewine#2 Permit to Drill Issued
5th Apr 20178:57 amRNSChange of Registered Office
5th Apr 20178:01 amRNSQuarterly Report
21st Mar 20177:01 amRNSOperations Commence at Icewine#2
14th Mar 20177:39 amRNSCleansing Notice & Appendix 3B
9th Mar 20177:31 amRNSResult of AGM
6th Mar 20177:00 amRNSOversubscribed Placement to Raise A$17 million
2nd Mar 20177:00 amRNSASX Trading Halt and Proposed Capital Raising
17th Feb 20178:00 amRNSInvester Presentation
16th Feb 20178:00 amRNSRig Contract Executed for Drilling of Icewine#2
16th Feb 20177:00 amRNSASX Lodgement of Annual Report
7th Feb 201711:09 amRNSNotice of AGM
2nd Feb 20171:27 pmRNSInvestor Briefing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.