The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.1675
Bid: 0.165
Ask: 0.17
Change: -0.0025 (-1.47%)
Spread: 0.005 (3.03%)
Open: 0.1675
High: 0.1675
Low: 0.16
Prev. Close: 0.17
88E Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Quarterly Report

19 Jul 2017 07:00

RNS Number : 4254L
88 Energy Limited
19 July 2017
 

 

19 July 2017

 

QUARTERLY REPORT

 

Report on Activities for the Quarter ended 30 June 2017

 

The Directors of 88 Energy Limited ("88 Energy" or the "Company", ASX & AIM:88E) provide the following report for the quarter ended 30 June 2017.

 

Highlights

 

· Spud of Icewine#2 Production Test well occurred on 24th April 2017, with the following key project milestones;

o The Arctic Fox drilling rig reached a Total Depth of 11,450' on 15th May 2017, on schedule and without incident;

o Wireline logging successfully completed throughout the production interval;

o Stage 1 and Stage 2 stimulation operations completed successfully, with over 98% of the intended proppant volume placed in the HRZ reservoir;

o Flowback commenced on 19th June 2017 with ~16% of stimulation fluid recovered prior to shut in on 10th July 2017, with trace hydrocarbons encountered during flowback; and

o Drilling and production testing expenditure anticipated to be within budget.

 

Key Events Subsequent to the Quarter End

 

The well was shut in on 10th July 2017 for an anticipated period of 6 weeks to allow for pressure build up and imbibition to occur.

 

Icewine#2 Operations

On 6th April 2017, approval of the Permit to Drill was granted by the Alaskan Oil and Gas Conservation Commission ('AOGCC') and shortly thereafter on 24th April the Icewine#2 well was spudded with the Arctic Fox rig.

The well reached a Total Depth ('TD') of 11,450' on the 15th of May, on schedule and without incident. Wireline logging, cementing the 4.5" production liner and demobilisation of the Artic Fox rig was completed by the end of May.

Log interpretation to finalise the stimulation design was completed in early June, and the two stage artificial stimulation of the HRZ reservoir was successfully completed on 19th June, with over 98% of the intended proppant volume placed into the HRZ reservoir.

Flow back from the upper zone commenced on 19th June, with approximately 8% of the total stimulation fluid recovered before it became apparent that the upper and lower zones were in communication, which consequently resulted in the drill out of the plug between the upper and lower zones.

Subsequent to period end the well was shut in on 10th July 2017 for an anticipated period of 6 weeks, with ~16% of stimulation fluid recovered prior to shut in.

Corporate

The ASX Appendix 5B attached to this report contains the Company's cash flow statement for the quarter. The significant cash flows for the period were:

 

· Exploration and evaluation expenditure of A$13.7m primarily relating to Icewine#2 operations and lease rental payments to the State of Alaska;

 

· Payments to the Bank of America in relation to the debt facility totalled A$0.6m (US$0.5m);

 

· Administration and other operating costs A$1.0m (March 2017 of A$0.9m); and

 

· Proceeds from issue of shares resulting from the conversion of options and warrants totalled A$0.5m.

 

At the end of the quarter, the Company had cash reserves of A$31.6m, including cash balances held in Joint Venture bank accounts.

 

Media and Investor Relations:

 

88 Energy Ltd

Dave Wall, Managing Director Tel: +61 8 9485 0990

Email: admin@88energy.com 

Finlay Thomson, Investor Relations Tel: +44 7976 248471

 

Hartleys Ltd

Dale Bryan Tel: + 61 8 9268 2829

 

Cenkos Securities

Neil McDonald/Derrick Lee Tel: +44 131 220 6939

 

This announcement contains inside information.

 

Pursuant to the requirements of the ASX Listing Rules Chapter 5 and the AIM Rules for Companies, the technical information and resource reporting contained in this announcement was prepared by, or under the supervision of, Mr Brent Villemarette, who is a Non Executive Director of the Company. Mr Villemarette has more than 30 years' experience in the petroleum industry, is a member of the Society of Petroleum Engineers, and a qualified Reservoir Engineer who has sufficient experience that is relevant to the style and nature of the oil prospects under consideration and to the activities discussed in this document. Mr Villemarette has reviewed the information and supporting documentation referred to in this announcement and considers the prospective resource estimates to be fairly represented and consents to its release in the form and context in which it appears. His academic qualifications and industry memberships appear on the Company's website and both comply with the criteria for "Competence" under clause 3.1 of the Valmin Code 2015. Terminology and standards adopted by the Society of Petroleum Engineers "Petroleum Resources Management System" have been applied in producing this document.

 

About 88 Energy: 88 Energy has a 77.5% working interest and operatorship in ~271,000 acres onshore the prolific North Slope of Alaska ("Project Icewine"). Gross contiguous acreage position will expand on award of additional leases successfully bid on in the December 2016 State of Alaska North Slope Licensing Round.The North Slope is the host to the 15 billion barrel Prudhoe Bay oilfield complex, the largest conventional oil pool in North America. The Company, with its Joint Venture partner Burgundy Xploration, has identified highly prospective play types that are likely to exist on the Project Icewine acreage - two conventional and one unconventional. The large unconventional resource potential of Project Icewine was independently verified by leading international petroleum resource consultant DeGolyer and MacNaughton. In addition to the interpreted high prospectivity, the project is strategically located on a year-round operational access road and only 35 miles south of Pump Station 1 where Prudhoe Bay feeds into the Trans Alaska Pipeline System. The Company acquired 2D seismic in early 2016 to take advantage of the globally unique fiscal system in Alaska, which allowed for up to 75% of 1H2016 exploration expenditure to be rebated in cash. Results from the seismic mapping and prospectivity review are encouraging, and form the basis of a conventional prospectivity portfolio for Project Icewine. In late 2015, the Company completed its maiden well at the project, Icewine#1, to evaluate an unconventional source rock reservoir play which yielded excellent results from analysis of core obtained from the HRZ shale. The follow-up well with a multi-stage stimulation and test of the HRZ shale, Icewine#2, spudded in 2Q 2017 with operations ongoing at 30 June 2017.

 

 

+Rule 5.5

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

 

Name of entity

88 Energy Limited

ABN

Quarter ended ("current quarter")

80 072 964 179

30 June 2017

 

Consolidated statement of cash flows

Current quarter $A'000

Year to date (6 months)$A'000

1.

Cash flows from operating activities

79

102

1.1

Receipts from customers

1.2

Payments for

(13,741)

(15,005)

(a) exploration & evaluation

(b) development

-

-

(c) production

-

-

(d) staff costs

(384)

(735)

(e) administration and corporate costs

 (632)

 (1,206)

1.3

Dividends received (see note 3)

-

-

1.4

Interest received

4

5

1.5

Interest and other costs of finance paid

-

-

1.6

Income taxes paid

-

-

1.7

Research and development refunds

-

-

1.8

Other (JV Partner Contributions - Burgundy Xploration)

6,626

6,626

1.9

Net cash from / (used in) operating activities

(8,048)

(10,213)

2.

Cash flows from investing activities

-

-

2.1

Payments to acquire:

(a) property, plant and equipment

(b) tenements (see item 10)

-

-

(c) investments

-

-

(d) other non-current assets

-

-

2.2

Proceeds from the disposal of:

-

-

(a) property, plant and equipment

(b) tenements (see item 10)

-

-

(c) investments

-

-

(d) other non-current assets

-

-

2.3

Cash flows from loans to other entities

-

-

2.4

Dividends received (see note 3)

-

-

2.5

Other (provide details if material)

-

-

2.6

Net cash from / (used in) investing activities

-

-

3.

Cash flows from financing activities

-

17,091

3.1

Proceeds from issues of shares

3.2

Proceeds from issue of convertible notes

-

-

3.3

Proceeds from exercise of share options

545

545

3.4

Transaction costs related to issues of shares, convertible notes or options

-

(1,250)

3.5

Proceeds from borrowings

-

-

3.6

Repayment of borrowings

-

-

3.7

Transaction costs related to loans and borrowings

-

-

3.8

Dividends paid

-

-

3.9

Other (provide details if material)

(665)

(665)

3.10

Net cash from / (used in) financing activities

(120)

15,721

4.

Net increase / (decrease) in cash and cash equivalents for the period

39,677

27,303

4.1

Cash and cash equivalents at beginning of period

4.2

Net cash from / (used in) operating activities (item 1.9 above)

(8,048)

(10,213)

4.3

Net cash from / (used in) investing activities (item 2.6 above)

-

-

4.4

Net cash from / (used in) financing activities (item 3.10 above)

(120)

15,721

4.5

Effect of movement in exchange rates on cash held

45

(1,257)

4.6

Cash and cash equivalents at end of period

31,554

31,554

 

5.

Reconciliation of cash and cash equivalentsat the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts

Current quarter$A'000

Previous quarter$A'000

5.1

Bank balances

31,554

39,677

5.2

Call deposits

-

-

5.3

Bank overdrafts

-

-

5.4

Other (provide details)

-

-

5.5

Cash and cash equivalents at end of quarter (should equal item 4.6 above)

31,554

39,677

 

6.

Payments to directors of the entity and their associates

Current quarter$A'000

6.1

Aggregate amount of payments to these parties included in item 1.2

182

6.2

Aggregate amount of cash flow from loans to these parties included in item 2.3

-

6.3

Include below any explanation necessary to understand the transactions included in items 6.1 and 6.2

6.1 All transactions involving directors and associates were on normal commercial terms.

 

 

 

7.

Payments to related entities of the entity and their associates

Current quarter$A'000

7.1

Aggregate amount of payments to these parties included in item 1.2

81

7.2

Aggregate amount of cash flow from loans to these parties included in item 2.3

-

7.3

Include below any explanation necessary to understand the transactions included in items 7.1 and 7.2

7.1 Consultant fees paid to associated entities were on normal commercial terms.

 

8.

Financing facilities availableAdd notes as necessary for an understanding of the position

Total facility amount at quarter end$US'000

Amount drawn at quarter end$US'000

8.1

Loan facilities

17,710

17,710

8.2

Credit standby arrangements

-

-

8.3

Other (please specify)

-

-

8.4

Include below a description of each facility above, including the lender, interest rate and whether it is secured or unsecured. If any additional facilities have been entered into or are proposed to be entered into after quarter end, include details of those facilities as well.

On 20 August 2015, 88 Energy entered into a credit agreement with the Bank of America. The facility is secured by available Production Tax Credits.

 

9.

Estimated cash outflows for next quarter

$A'000

9.1

Exploration and evaluation*

(17,600)

9.2

Development

-

9.3

Production

-

9.4

Staff costs

(370)

9.5

Administration and corporate costs

(550)

9.6

Other (provide details if material)

(210)

9.7

Total estimated cash outflows

(18,730)

* Includes amounts relating to lease rentals, lease acquisition, seismic acquisition & interpretation, G&A, G&G, expenditure on Icewine#2 operations including potential refund to JV partners for activities achieved under budget.

10.

Changes in tenements(items 2.1(b) and 2.2(b) above)

Tenement reference and location

Nature of interest

Interest at beginning of quarter

Interest at end of quarter

10.1

Interests in mining tenements and petroleum tenements lapsed, relinquished or reduced

N/A

10.2

Interests in mining tenements and petroleum tenements acquired or increased

N/A

Compliance statement

1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.

2 This statement gives a true and fair view of the matters disclosed.

 

Sign here: ............................................................ Date: .............................................

(Company Secretary)

 

Print name: Sarah Smith

 

Notes

1. The quarterly report provides a basis for informing the market how the entity's activities have been financed for the past quarter and the effect on its cash position. An entity that wishes to disclose additional information is encouraged to do so, in a note or notes included in or attached to this report.

2. If this quarterly report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.

3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSFMFIAFWSEEW
Date   Source Headline
24th Apr 20247:00 amRNSSuccessful Placement To Raise A$9.9M
23rd Apr 20247:08 amRNSProposed placing to raise up to A$9.8 million
19th Apr 20247:00 amRNSFurther Information on Hickory-1 Flow Test Results
18th Apr 20247:00 amRNSQuarterly Report and Appendix 5B
17th Apr 20247:00 amRNSInvestor Presentation
15th Apr 20247:00 amRNSHickory-1 Flow Test – Second Light Oil Discovery
2nd Apr 20247:00 amRNSHickory-1 Upper SFS Zone Flows Light Oil
28th Mar 20247:00 amRNSNotice of Annual General Meeting
28th Mar 20247:00 amRNSLODGEMENT OF ANNUAL REPORT
25th Mar 20247:00 amRNSHickory-1 Flow Test Operations Update
11th Mar 20247:00 amRNSHickory-1 Flow Test Operations Commenced
1st Mar 20247:00 amRNSNotice of AGM and Deadline for Director Nomination
29th Feb 20248:33 amRNSIssue of Equity
28th Feb 20247:00 amRNSHickory-1 Flow Test Operations Update
22nd Feb 20247:00 amRNSNamibian PEL93 Working Interest Transfer Approved
19th Feb 20247:00 amRNSHickory-1 Flow Test Imminent
8th Feb 20247:00 amRNSChange of Auditor
5th Feb 20247:00 amRNSHickory-1 Pre-Flow Test Operations on Track
30th Jan 20247:00 amRNSQuarterly Report and Appendix 5B
15th Jan 202410:58 amRNSResult of General Meeting
12th Jan 20242:27 pmRNSIssue of Equity
12th Jan 20247:00 amRNSHickory-1 Flow Test Update
21st Dec 20237:00 amRNSProject Peregrine Update
20th Dec 20237:06 amRNSYear-End Shareholder Update
15th Dec 20237:00 amRNSAcquisition of Texas Oil & Gas Production Assets
14th Dec 20237:00 amRNSNotice of General Meeting
5th Dec 20237:15 amRNSProject Phoenix – JV Partner Update
29th Nov 20237:03 amRNSSuccessful Placement To Raise A$9.9M
28th Nov 20237:00 amRNSProposed placing to raise A$9.9 million
17th Nov 20233:11 pmRNSChange of Nominated Adviser
14th Nov 20233:09 pmRNSCorporate Presentation
13th Nov 20237:00 amRNSNAMIBIAN OIL AND GAS FARM-IN AGREEMENT
6th Nov 20237:00 amRNSHickory-1: BFF Maiden Contingent Resource Estimate
31st Oct 20237:00 amRNSQuarterly Report and Appendix 5B
30th Oct 20237:00 amRNSPROJECT PHOENIX – BFF CONTINGENT RESOURCE ESTIMATE
12th Oct 20237:00 amRNSAlaskan Portfolio Update
21st Sep 20237:00 amRNSHickory-1 Well Flow Test Planning Update
13th Sep 20239:30 amRNSSmall Holding Share Sale Facility Update
8th Sep 20237:00 amRNSHalf-Year Financial Report
5th Sep 20237:00 amRNSHickory-1 Well Flow Test – Rig Contract Executed
31st Aug 20237:20 amRNSDirector Dealings
30th Aug 202312:07 pmRNSCompletion of Rights Issue Shortfall Placement
29th Aug 20237:01 amRNSProposed placing to raise up to £4.5 million
29th Aug 20237:00 amRNSCompletion of Rights Issue
31st Jul 20237:00 amRNSProject Peregrine Prospective Resources Update
31st Jul 20237:00 amRNSInvestor Presentation
31st Jul 20237:00 amRNSQuarterly Report and Appendix 5B
31st Jul 20237:00 amRNSNon-Renounceable Rights Issue
3rd Jul 20237:00 amRNSAcquisition of Texas Oil and Gas Production Assets
27th Jun 20237:00 amRNSProject Leonis Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.