Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.1575
Bid: 0.155
Ask: 0.16
Change: -0.0025 (-1.56%)
Spread: 0.005 (3.226%)
Open: 0.16
High: 0.16
Low: 0.1575
Prev. Close: 0.16
88E Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Further Information on Hickory-1 Flow Test Results

19 Apr 2024 07:00

RNS Number : 3061L
88 Energy Limited
19 April 2024
 

19 April 2024

 

88 Energy Limited

FURTHER INFORMATION ON HICKORY-1 FLOW TEST RESULTS

ANNOUNCED 2 AND 15 APRIL 2024

 

Highlights

· Dual success at Hickory-1 with the flowing of light oil from the USFS and SMD reservoirs.

· Post flow test studies to commence including the securing of additional Contingent Resource estimates.

· Commercialisation options to be considered in parallel, including farm-out to a strategic development partner and/or early and a capital-lite development.

 

88 Energy Limited (ASX:88E, AIM:88E, OTC:EEENF) (88 Energy or the Company) is pleased to provide a further update and information in relation to the successful flow test results announced on 2 April and 15 April 2024, from the Company's Hickory-1 discovery well, located in Project Phoenix on the North Slope of Alaska (88 Energy ~75% WI owner).

 

As announced, light oil was recovered from both the USFS and SMD-B reservoirs, with key details from each test summarised below, and to provide additional clarification on the reported results.

Upper SFS (USFS) Flow Test Results

· A 20ft perforated interval in the Upper SFS reservoir was stimulated via a single fracture stage of 241,611 lbs proppant volume.

· The well was cleaned-up and flowed for 111 hours in total, of which 88 hours was under natural flow back and 23.5 hours utilising nitrogen lift. Of the 88 hours of natural flow back period included ~78 hours of clean up with trace oil recovered during this time, and a period of ~ 10.5 hours of established production.

· During the established production period of 10.5 hours the well produced at an average oil flow rate of ~ 42 bopd during the natural flow back period, producing a total of ~ 19bbls of oil. Approximately 6bbls of oil was also recovered during the clean up / non-established production period.

· The USFS test produced at a peak flow rate of over ~70 bopd, which was an instantaneous rate calculated during flow back period via an oil tank volume measurement of 1.55 bbls over a 30 minute period.

· Multiple oil samples were recovered with measured oil gravities of between 39.9 to 41.4 API (representing a light crude oil).

 

SMD-B Flow Test Results

· A 20ft perforated interval in the SMD-B reservoir was stimulated via a single fracture stage of 226,967 lbs proppant volume.

· The well was cleaned-up and flowed for 84 hours in total under nitrogen lift, with ~68 hours of clean up prior to the flowing of oil to surface, with the well flowing oil over ~16 hour period.

· The well produced at an average oil cut of 4% following initial oil to surface, with instantaneous rates observed during the 16-hour period varying as the well continued to clean up at managed fluid flow rate of ~170 bbls/d with a calculated total volume during the flow back period following establishment of oil cut of ~4 bbls of oil.

· The SMD-B test produced at a calculated peak flow rate of ~50 bopd, which was an instantaneous rate calculated during the flow back period via a measurement of observed oil cut and fluid flow rates.

· Multiple oil samples were recovered with measured oil gravities of between 38.5 to 39.5 API (representing a light crude oil).

 

Forward Plan

 

Following the successful flow testing at the Hickory-1 discovery well, 88 Energy will be focused on:

 

· Completing post-well testing and analysis at Hickory-1;

· Securing a contingent resource for the SFS and SMD reservoirs;

· Commencing a formal farm-out process to attract a high-quality new partner to fund the next stage of appraisal and development; and

· Advance planning and design of an early stage production system.

 

The Company looks forward to updating shareholders on the post test analysis.

 

This announcement has been authorised by the Board.

 

Media and Investor Relations:

 

88 Energy Ltd

Ashley Gilbert, Managing Director

Tel: +61 (0)8 9485 0990

Email:investor-relations@88energy.com

Fivemark Partners, Investor and Media Relations

Michael Vaughan

Tel: +61 (0)422 602 720

EurozHartleys Ltd

Dale Bryan

Tel: +61 (0)8 9268 2829

Cavendish Capital Markets Limited

Tel: +44 (0)207 220 0500

Derrick Lee

Tel: +44 (0)131 220 6939

Pearl Kellie

Tel: +44 (0)131 220 9775

 

Pursuant to the requirements of the ASX Listing Rules Chapter 5 and the AIM Rules for Companies, the technical information and resource reporting contained in this announcement was prepared by, or under the supervision of, Dr Stephen Staley, who is a Non-Executive Director of the Company. Dr Staley has more than 40 years' experience in the petroleum industry, is a Fellow of the Geological Society of London, and a qualified Geologist/Geophysicist who has sufficient experience that is relevant to the style and nature of the oil prospects under consideration and to the activities discussed in this document. Dr Staley has reviewed the information and supporting documentation referred to in this announcement and considers the resource and reserve estimates to be fairly represented and consents to its release in the form and context in which it appears. His academic qualifications and industry memberships appear on the Company's website and both comply with the criteria for "Competence" under clause 3.1 of the Valmin Code 2015. Terminology and standards adopted by the Society of Petroleum Engineers "Petroleum Resources Management System" have been applied in producing this document.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDDZGMDKLDGDZG
Date   Source Headline
24th Apr 20247:00 amRNSSuccessful Placement To Raise A$9.9M
23rd Apr 20247:08 amRNSProposed placing to raise up to A$9.8 million
19th Apr 20247:00 amRNSFurther Information on Hickory-1 Flow Test Results
18th Apr 20247:00 amRNSQuarterly Report and Appendix 5B
17th Apr 20247:00 amRNSInvestor Presentation
15th Apr 20247:00 amRNSHickory-1 Flow Test – Second Light Oil Discovery
2nd Apr 20247:00 amRNSHickory-1 Upper SFS Zone Flows Light Oil
28th Mar 20247:00 amRNSNotice of Annual General Meeting
28th Mar 20247:00 amRNSLODGEMENT OF ANNUAL REPORT
25th Mar 20247:00 amRNSHickory-1 Flow Test Operations Update
11th Mar 20247:00 amRNSHickory-1 Flow Test Operations Commenced
1st Mar 20247:00 amRNSNotice of AGM and Deadline for Director Nomination
29th Feb 20248:33 amRNSIssue of Equity
28th Feb 20247:00 amRNSHickory-1 Flow Test Operations Update
22nd Feb 20247:00 amRNSNamibian PEL93 Working Interest Transfer Approved
19th Feb 20247:00 amRNSHickory-1 Flow Test Imminent
8th Feb 20247:00 amRNSChange of Auditor
5th Feb 20247:00 amRNSHickory-1 Pre-Flow Test Operations on Track
30th Jan 20247:00 amRNSQuarterly Report and Appendix 5B
15th Jan 202410:58 amRNSResult of General Meeting
12th Jan 20242:27 pmRNSIssue of Equity
12th Jan 20247:00 amRNSHickory-1 Flow Test Update
21st Dec 20237:00 amRNSProject Peregrine Update
20th Dec 20237:06 amRNSYear-End Shareholder Update
15th Dec 20237:00 amRNSAcquisition of Texas Oil & Gas Production Assets
14th Dec 20237:00 amRNSNotice of General Meeting
5th Dec 20237:15 amRNSProject Phoenix – JV Partner Update
29th Nov 20237:03 amRNSSuccessful Placement To Raise A$9.9M
28th Nov 20237:00 amRNSProposed placing to raise A$9.9 million
17th Nov 20233:11 pmRNSChange of Nominated Adviser
14th Nov 20233:09 pmRNSCorporate Presentation
13th Nov 20237:00 amRNSNAMIBIAN OIL AND GAS FARM-IN AGREEMENT
6th Nov 20237:00 amRNSHickory-1: BFF Maiden Contingent Resource Estimate
31st Oct 20237:00 amRNSQuarterly Report and Appendix 5B
30th Oct 20237:00 amRNSPROJECT PHOENIX – BFF CONTINGENT RESOURCE ESTIMATE
12th Oct 20237:00 amRNSAlaskan Portfolio Update
21st Sep 20237:00 amRNSHickory-1 Well Flow Test Planning Update
13th Sep 20239:30 amRNSSmall Holding Share Sale Facility Update
8th Sep 20237:00 amRNSHalf-Year Financial Report
5th Sep 20237:00 amRNSHickory-1 Well Flow Test – Rig Contract Executed
31st Aug 20237:20 amRNSDirector Dealings
30th Aug 202312:07 pmRNSCompletion of Rights Issue Shortfall Placement
29th Aug 20237:01 amRNSProposed placing to raise up to £4.5 million
29th Aug 20237:00 amRNSCompletion of Rights Issue
31st Jul 20237:00 amRNSProject Peregrine Prospective Resources Update
31st Jul 20237:00 amRNSInvestor Presentation
31st Jul 20237:00 amRNSQuarterly Report and Appendix 5B
31st Jul 20237:00 amRNSNon-Renounceable Rights Issue
3rd Jul 20237:00 amRNSAcquisition of Texas Oil and Gas Production Assets
27th Jun 20237:00 amRNSProject Leonis Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.