Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin America. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.1675
Bid: 0.165
Ask: 0.17
Change: -0.0025 (-1.47%)
Spread: 0.005 (3.03%)
Open: 0.1675
High: 0.1675
Low: 0.16
Prev. Close: 0.17
88E Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Acquisition of Texas Oil and Gas Production Assets

3 Jul 2023 07:00

RNS Number : 6561E
88 Energy Limited
03 July 2023
 

This announcement contains inside information

3 July 2023

 

88 Energy Limited

Acquisition of Additional Texas Oil and Gas Production Assets

Highlights

· Acquisition of further non-operated working interest (WI) in leases and wells with conventional onshore production and in development assets within the Permian Basin of Texas, U.S.

· Average net working interest acquired by 88 Energy of approximately 45% based on 88E WI in 435 net acres.

· New acreage is located approximate 4 miles south of existing Project Longhorn production assets.

· Operator of the Project Longhorn assets, Lonestar I, LLC, will also acquire a working interest in the new assets and will operate the new field through an affiliate, with the remaining interests retained by existing joint venture partners.

· The purchase price of US$1.5M (net to 88E US$1.1M) to be paid in cash by 88 Energy and the JV partner Lonestar I, LLC (the Operator).

· Attractive low-cost entry of ~US$1.00 per BOE across net 2P reserves of 1.1MMBOE1,2.

· Additional upside potential identified in multiple zones and classified as Possible Reserves (0.3 MMBOE1,2), along with Contingent and Prospective Resources which are yet to be quantified.

· Operator targeting 2 new production wells in 2H 2023 expected to increase production to 160-200 BOE gross per day (~75% oil). Limited existing production of approx. 12 BOE per day gross (~75% oil) across 8 historical and depleted wells).

· Complements the further 2 work-overs planned in 2H 2023 on the existing Longhorn acreage.

· Upon successful completion of the new wells and work-overs across all its Texan acreage, together with the existing producing wells, 88 Energy expects Project Longhorn total gross production to reach approximately 500 BOE per day (~75% oil) by year end 2023.

 

88 Energy Limited (ASX:88E, AIM:88E, OTC:EEENF) (88 Energy or the Company) is pleased to announce the execution of binding agreements for the acquisition of a new non-operated working interest (averaging ~45% net to 88 Energy) in leases and wells with conventional onshore production and in development assets within the Permian Basin of Texas, U.S.

 

The new oil and gas production and development assets will form an expansion of the existing Project Longhorn (Longhorn) acreage and are located approximately 4 miles to the south. The newly acquired acreage is estimated to contain independently certified net 2P reserves of 1.1 MMBOE1,2.

1 Refer to page 3 for initial reserves estimates and assumptions.

2 Net Revenue Entitlement to 88 Energy

 

 

Importantly, all proposed well locations have been classified as low risk, accessing Proven reserves totalling 0.97 MMBOE1,2-, given the production histories from existing wells on the newly acquired leases as well as adjacent leases. Additionally, these wells should intersect multiple potentially oil-bearing intervals which have been successfully developed in the vicinity of Project Longhorn. Consequently, upside has been identified and classified as Contingent or Prospective Resources and will be quantified in due course.

The purchase price for the acquisition is US$1.5 million (net to 88E US$1.1 million) to be to be paid in cash by 88 Energy and Lonestar I, LLC.

The acquisition provides 88 Energy with immediate production upside through 2 new wells planned in 2H 2023 (on leases which Longhorn will have ~75% working interest), each anticipated to deliver IP30 of approximately 80-100 BOE per day gross (~75% oil), with each well anticipated to cost ~US$1.5 million net to 88E (to be funded primarily through forecasted cash flow from existing Longhorn production assets).

The existing Project Longhorn assets are currently producing ~400 BOE per day gross (~ 75% oil), which together with the two new wells planned on the newly acquired acreage, as well as 2 work-overs on the existing Longhorn acreage, are anticipated to deliver a gross production rate of approximately 500 BOE per day by the end of 2023.

 

Figure 1: Project Longhorn existing and new acreage

 

 

 

The acquisition represents a further expansion of 88 Energy's move into producing oil and gas assets and is in line with the Company's strategy to build a successful exploration and production company. This further step has again been undertaken in a measured fashion via the purchase of a non-operated working interest whilst retaining a single basin focus. Project Longhorn contains well understood geology with low technical risk and provides near-term upside via low-cost field development opportunities.

Project Longhorn: Existing and New Acreage - conventional onshore oil & gas in Texas

The existing and newly acquired Project Longhorn assets are in the attractive Permian Basin; they cover approximately 1,399 net acres (of which 435 acres relates to the newly acquired leases). The combined portfolio of assets consists of 14 leases 5 newly acquired leases) with 40 producing wells (8 within the newly acquired leases) and associated infrastructure. Lonestar I, LLC will have a working interest in the assets, and through an affiliate will continue as Operator for the existing and new leases and wells, with the remaining working interests retained by existing Joint Venture partners.

The existing production wells in the newly acquired acreage have been in operation for several years. Production from the new Project Longhorn leases in FY2022 totalled approximately 5,000 BOE, which had an immaterial estimated attributable net profit/loss before tax for the project (unaudited). Current average production is approximately 12 BOE per day (88 Energy's net working interest: ~10 BOE per day), of which approximately 75% is oil.

As part of the acquisition, 88 Energy has agreed to a low-cost 2 well work program for 2H CY2023 (on leases in which Longhorn has a ~75% working interest). These initiatives are expected to deliver initial production rates of approximately 160-200 BOE per day gross (~75% oil).

Gross (100%) and Net Entitlement Reserves to 88 Energy (~45% net working or net revenue interest ~38%) have been independently assessed by PJG Petroleum Engineers LLC as at 1 June 2023 as follows:

Table 1: Project Longhorn - Bighorn Phase 2 - Reserves (MMBOE)

GROSS RESERVES

NET 88 ENERGY REVENUE ENTITLEMENT

1P

2P

3P

1P

2P

3P

2.25

2.74

3.37

0.97

1.14

1.35

Further ASX Listing Rule 5.31 Information (Notes to Reserves) related to these Reserves is provided in Appendix 1.

Reserves Cautionary Statement

Oil and gas reserves and resource estimates are expressions of judgment based on knowledge, experience and industry practice. Estimates that were valid when originally calculated may alter significantly when new information or techniques become available. Additionally, by their very nature, reserve and resource estimates are imprecise and depend to some extent on interpretations, which may prove to be inaccurate. As further information becomes available through additional drilling and analysis, the estimates are likely to change. This may result in alterations to development and production plans which may, in turn, adversely impact the Company's operations. Reserves estimates and estimates of future net revenues are, by nature, forward looking statements and subject to the same risks as other forward-looking statements.

 

Acquisition details

On 1 July 2023 the Company, via its 75% ownership interest in subsidiary Bighorn Energy, LLC (Bighorn), acquired an interest in the new leases (Bighorn Phase 2 leases) from Oxy USA WTP LP for consideration of US$1.5 million gross to be paid in cash by 88 Energy and Lonestar I, LLC. Bighorn will acquire interests in the Bighorn Phase 2 leases of between 8% - 100% gross working interest of the leases and wells.

Lonestar I, LLC is a privately held oil and gas production company located in Texas U.S., with significant experience in operating profitable oil and gas assets. Lonestar I, LLC and its affiliates have built a team of experienced oil and gas professionals with broad technical and commercial skills that will continue to Operate the assets on behalf of the Joint Venture. Together with 88 Energy they will work to improve production and profitability of the assets and have the capacity to both financially and technically deliver on future development work programs. 88 Energy has completed customary due diligence on both the assets and Lonestar I, LLC.

This announcement has been authorised by the Board.

 

Media and Investor Relations:

 

88 Energy Ltd

Ashley Gilbert, Managing Director

Tel: +61 8 9485 0990

Email: investor-relations@88energy.com

Fivemark Partners, Investor and Media Relations

Michael Vaughan

Tel: +61 422 602 720

EurozHartleys Ltd

Dale Bryan

Tel: + 61 8 9268 2829

Cenkos Securities Plc

Tel: +44 (0)20 7397 8900

Derrick Lee 

Tel: +44 (0)131 220 6939

Pearl Kellie

Tel: +44 (0)131 220 9775

 

Glossary 

Bbl = barrels

Bcf = billion cubic feet

Bcfg = billion cubic feet of gas

Boe = barrels of oil equivalent

Bopd = barrels of oil per day

Btu = British Thermal Units

mcfg = thousand cubic of gas

mmcfg = million cubic feet of gas

mcfgpd = thousand cubic feet of gas per day

mmcf = million cubic feet

 

 

Mbo/Mbbl = thousand barrels of oil

MMbo/MMbbl = million barrels of oil

Mboe = thousand barrels of oil equivalent

MMboe = million barrels of oil equivalent

Mcf = thousand cubic feet

MMcf = million cubic feet

mmbtu = million British Thermal Units

psi = pounds per square inch

UoM = unit of measure

IP30 = Average production rate over the first 30 days of production

 

Appendix 1 - ASX Listing Rule 5.31 Information (Notes to Reserves)

 

Reserve Evaluation; Project Longhorn -Bighorn Phase 2 Leases

 

Highlights:

 

· PJG Petroleum Engineers LLC (PJG) has prepared the reserve estimates and a forecast of prices and costs evaluation of the oil and gas properties of Project Longhorn - Bighorn Phase 2 leases (New Leases). The effective date of the reserve estimates and cash flow forecasts presented in this release is June 1, 2023.

· The PJG evaluation has been prepared for 88 Energy in accordance with reserves definitions, standards and procedures contained the Society of Petroleum Engineers' Petroleum Resources Management System (SPE-PRMS) and reported in the most specific resource class in which the prospective resource can be classified under 2018 SPE-PRMS. The reserves presented in the PJG report are based on forecast prices and costs. Economic Limit Tests (ELTs) used to estimate Reserves shown above were carried out assuming a constant WTI crude oil price of US$75/bbl and a constant US$2.50/mmbtu for the NYMEX gas price. All oil prices used in the evaluation have been adjusted from the reference price for quality and transportation, which is -$6.80/bbl based on historical averages. Gas prices account for NGL's in the gas and have been adjusted for heating value by a factor of 1.60 mbtu/cf based on historical averages. As a result, the net oil and gas prices used in this report are US$68.20/bbl and US$4.00/mcf respectively.

· The Proved reserves (1P) net of royalties are 0.69 million bbl of oil and 1.4 bcf of gas, or 0.97 million boe, net to 88 Energy.

· The Proved plus Probable reserves (2P) net of royalties are 0.82 million bbl of oil and 1.6 bcf of gas, or 1.1 million boe, net to 88 Energy.

· The Proved plus Probable plus Possible reserves (3P) net of royalties are 0.97 million bbl of oil and 1.9 bcf of gas, or 1.4 million boe.

 

Background

 

88 Energy, via its 75% ownership interest in Bighorn (and Lonestar who have a 25% ownership interest in Bighorn), acquired the New Leases from Oxy USA WTP LP on 1 July 2023. The leases comprise approximately 581 Bighorn net acres across 5 leases with 8 producing wells and associated infrastructure.

 

Table 2: Developed Reserves

 

RESERVES

GROSS

NET ENTITLEMENT

UoM

1P

2P

3P

1P

2P

3P

OIL

MMBO

0.05

0.09

0.11

0.01

0.02

0.03

GAS

BCF

0.21

0.30

0.46

0.06

0.08

0.12

TOTAL reserves

MMBOE

0.09

0.14

0.20

0.03

0.04

0.05

 

Table 3: Undeveloped Reserves

 

RESERVES

GROSS

NET ENTITLEMENT

UoM

1P

2P

3P

1P

2P

3P

OIL

MMBO

1.54

1.88

2.29

0.67

0.80

0.94

GAS

BCF

3.07

3.57

4.38

1.33

1.50

1.78

TOTAL reserves

MMBOE

2.16

2.60

3.17

0.94

1.10

1.30

 

Table 4: Total Reserves

 

RESERVES

GROSS

NET ENTITLEMENT

UoM

1P

2P

3P

1P

2P

3P

OIL

MMBO

1.59

1.97

2.40

0.69

0.82

0.97

GAS

BCF

3.28

3.86

4.83

1.39

1.57

1.89

TOTAL reserves

MMBOE

2.25

2.74

3.37

0.97

1.14

1.35

 

The subsequent sections detail the field and reserves/ resources information for compliance with ASX listing rules pertaining to the first announcement of material oil and gas projects.

 

Assumptions and Notes

 

a) The reserves information in this document is effective as of 1 June 2023  (Listing Rule (LR) 5.25.1).

b) The reserves information in this document has been estimated and is classified in accordance with SPEPRMS (Society of Petroleum Engineers Petroleum Resources Management System) (LR 5.25.2).

c) The reserves information in this document is reported according to the Company's economic interest in each of the reserves net of royalties (LR 5.25.5).

d) The reserves information in this document has been estimated and prepared using the deterministic method (LR 5.25.6).

e) The reserves information in this document has been estimated using a 5:1 BOE conversion ratio for gas to oil; 5:1 conversion ratio is based on an energy equivalency conversion method and does not represent value equivalency (LR 5.25.7).

f) The reserves information in this document has been estimated on the basis that products are sold on the spot market with delivery at the sales point on the production facilities (LR 5.26.5).

g) The method of aggregation used in calculating estimated reserves was the arithmetic summation by category of reserves. As a result of the arithmetic aggregation of the field totals, the aggregate 1P may be a conservative estimate and the aggregate 3P may be an optimistic estimate due to the portfolio effects of arithmetic summation (LR 5.26.7 & 5.26.8)

h) Project Longhorn - Bighorn Phase 2 leases reserves are located in the Permian Basin, Texas, USA.

 

ASX LR 5.31 Reserves - Project Longhorn - Bighorn Phase 2 Leases

 

Project Longhorn - Bighorn Phase 2 Leases, 88 Energy

LR 5.31.1 - Material economic assumptions used to calculate the  estimates of petroleum reserves

Oil and gas prices - Oil prices used in this report were kept constant at US$75/bbl to end of field life for WTI crude oil. This was then adjusted to account for transportation and quality differences based on historical actual prices achieved, which averaged a $6.80/bbl deduction.

Natural gas prices used in this report were kept constant at US$2.50/mmbtu for the NYMEX benchmark to the end of field life. Gas prices account for NGL's in the gas and have been adjusted for heating value by a factor of 1.60 mbtu/cf based on historical averages. Consequently, the net gas price used in this report is US$4.00/mcf.

 

Capex - gross capital costs were estimated by the Operator covering drilling and completion, recompletion and abandonment costs considered necessary to recover  the reserves. Capital costs were considered reasonable by PJG, which cost between US$0.55 million and US$2.0 million depending on the type of activity performed.

Opex - gross operating costs were based on historical lease operating statements. These forecasts were considered to be reasonable by PJG.

Discount rate - pre-tax discount rate of 10%

LR 5.31.2 Operator or non-operator interests

Longhorn Energy Investments LLC, a wholly owned subsidiary of 88 Energy Limited, is a non- operator of Project Longhorn and has an average 62% working interest across the leases, based on area. Table 5 shows lease working interests for the new acreage - Bighorn Phase 2 leases.

LR 5.31.3 Permits or Licenses

Project Longhorn consists of 14 leases located in the Permian Basin, Texas, USA. All leases are Held by Production, have no expiry date and no drilling obligations.

LR 5.31.4 Description of:

· Basis for confirming commercial producibility and booking reserves.

Economic Limit Tests were performed and project NPVs calculated to satisfy the commerciality requirements of the PRMS. PJG carried out these analyses for all wells - current and proposed, based on pricing noted above under LR 5.31.1, Operator provided third party gas plant and oil purchaser statements, Operator provided current royalty rates and all applicable State of Texas oil and gas taxation roles applicable to the specific areas of operations. Future capital requirements and actual historical operating costs were obtained from the Operator's projections and were accepted as reasonable.

The commercial producibility of undeveloped reserves is based on stabilised production rates from existing wells and production analogues from the same formations.

· Analytical procedures used to estimate the petroleum reserves

PJG has relied on Decline Curve Analysis techniques for this evaluation. Production decline analysis was performed using all available production/well test data to estimate a range (Low, Best and High Cases) of production forecasts, which were used as the basis for estimating reserves. An uncertainty range in both the decline rate and the exponent factor of the hyperbolic decline fit was applied to forecast different decline trends attributable to uncertainty in reservoir performance, and to estimate the oil production volumes for the 1P, 2P and 3P reserves categories. These reserves were sense checked against volumetric reserve calculations based on log derived parameters.

 Production records were obtained from the Texas Railroad Commission (TRRC) on a lease basis, or when applicable, by combining Operator identified API Number well data historical records, to serve as the basis of the production volumes in our decline curve analysis. This data matched Operator provided data.

· Proposed extraction method and any specialised processing required following extraction required

All current and proposed wells will utilize sucker rod pumping systems to artificially lift the oil to surface. The reservoirs are largely depletion / solution gas drive with some reservoirs having water aquifer support.

LR 5.31.5 - Estimated quantities to  be recovered

See Tables 2-4 inclusive at the start of Appendix 1.

LR 5.31.6 - Undeveloped petroleum reserves; a brief statement regarding:-

· Status of the project

· When development is anticipated

· Marketing arrangements

· Access to transportation infrastructure

· Environmental approvals required

All undeveloped reserves are all located within 1320 ft (40 acres spacing) of existing production; hence development of these reserves simply requires a completed well and tie back to existing production. Two new wells are budgeted to be drilled and completed in 2023. The fifteen remaining development activities are planned for the 2024-2026 period. All existing marketing arrangements, transportation infrastructure and approvals are planned and budgeted to be utilized.

LR 5.31.7 - Unconventional petroleum resources

Not applicable.

LR 5.32 - Project estimates that have materially changed from when the estimates were previously reported

Not applicable; this report constitutes first time reporting for Project Longhorn - Bighorn Phase 2leases.

 

Definitions

· Reserves are those quantities of petroleum that are anticipated to be commercially recoverable by application of development projects to known accumulations from a given date forward under defined conditions. Reserves must further satisfy four criteria, based on the development project(s) applied: discovered, recoverable, commercial and remaining (as of the evaluation date).

· 1P is defined as Proven reserves. 2P is defined as Proven plus Probable reserves. 3P is defined as Proven plus Probable plus Possible reserves.

· 1P or Proven Reserves are those quantities of petroleum that, by analysis of geoscience and engineering data, can be estimated with reasonable certainty to be commercially recoverable from a given date forward from known reservoirs and under defined economic conditions, operating methods, and government regulations. This is typically considered to have more than a 90% likelihood of occurring.

· Probable Reserves are those additional reserves that analysis of geoscience and engineering data indicates are less likely to be recovered than proved reserves but more certain to be recovered than possible reserves. This is typically considered to have approximately a 50% likelihood of occurring.

· Possible Reserves are those additional reserves that are less certain to be recovered than probable reserves. It is unlikely that the actual remaining quantities recovered will exceed the sum of the estimated proved plus probable plus possible reserves. This is typically considered to have approximately a 10% likelihood of occurring.

· Developed reserves are expected to be recoverable from existing wells and facilities. Undeveloped reserves will be recovered through future investments (e.g. through installation of compression, new wells into different but known reservoirs, or infill wells that will increase recovery). Total reserves are the sum of developed and undeveloped reserves at a given level of certainty.

· Contingent Resources (2C) are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations by application of development projects, but which are not currently considered to be commercially recoverable owing to one or more contingencies.

· Prospective Resources are those quantities of petroleum that are estimated, as of a given date, to be potentially recoverable from undiscovered accumulations.

 

Qualified petroleum reserves and resources evaluator statement

The petroleum reserves and resources information in this announcement are based on, and fairly represents, information and supporting documentation prepared by Paul J Griffith. Mr. Griffith has over 35 years of experience in senior technical positions in reservoir, production, and field engineering. He is a registered Professional Engineer in the State of Texas (Credential ID 68149), United States of America, his Firm PJG Petroleum Engineers, LLC is registered to provide Petroleum Engineering services by the State of Texas Board of Professional Engineers under Firm #F-23307. Mr Griffith is a Lifetime Member of the Society of Petroleum Engineers. Mr Griffith is not an employee of 88 Energy or any of its subsidiaries and has consented in writing to the inclusion of the petroleum reserves and resources information in this announcement in the form and context in which it appears.

 

Table 5: Working Interest

 

 

Lease

Bighorn Energy

WI

88 EnergyWI

LEASE

NRI

88 Energy Revenue Interest

L2-1

100%

75%

85%

64%

L2-2

50%

38%

85%

32%

L2-3

50%

38%

75%

28%

L2-4 *

60%

45%

75%

34%

L2-5

8%

6%

75%

4%

Area Weighted Average

61%

45%

83%

38%

*Working interest in well.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
ACQMZGGNMZFGFZZ
Date   Source Headline
24th Apr 20247:00 amRNSSuccessful Placement To Raise A$9.9M
23rd Apr 20247:08 amRNSProposed placing to raise up to A$9.8 million
19th Apr 20247:00 amRNSFurther Information on Hickory-1 Flow Test Results
18th Apr 20247:00 amRNSQuarterly Report and Appendix 5B
17th Apr 20247:00 amRNSInvestor Presentation
15th Apr 20247:00 amRNSHickory-1 Flow Test – Second Light Oil Discovery
2nd Apr 20247:00 amRNSHickory-1 Upper SFS Zone Flows Light Oil
28th Mar 20247:00 amRNSNotice of Annual General Meeting
28th Mar 20247:00 amRNSLODGEMENT OF ANNUAL REPORT
25th Mar 20247:00 amRNSHickory-1 Flow Test Operations Update
11th Mar 20247:00 amRNSHickory-1 Flow Test Operations Commenced
1st Mar 20247:00 amRNSNotice of AGM and Deadline for Director Nomination
29th Feb 20248:33 amRNSIssue of Equity
28th Feb 20247:00 amRNSHickory-1 Flow Test Operations Update
22nd Feb 20247:00 amRNSNamibian PEL93 Working Interest Transfer Approved
19th Feb 20247:00 amRNSHickory-1 Flow Test Imminent
8th Feb 20247:00 amRNSChange of Auditor
5th Feb 20247:00 amRNSHickory-1 Pre-Flow Test Operations on Track
30th Jan 20247:00 amRNSQuarterly Report and Appendix 5B
15th Jan 202410:58 amRNSResult of General Meeting
12th Jan 20242:27 pmRNSIssue of Equity
12th Jan 20247:00 amRNSHickory-1 Flow Test Update
21st Dec 20237:00 amRNSProject Peregrine Update
20th Dec 20237:06 amRNSYear-End Shareholder Update
15th Dec 20237:00 amRNSAcquisition of Texas Oil & Gas Production Assets
14th Dec 20237:00 amRNSNotice of General Meeting
5th Dec 20237:15 amRNSProject Phoenix – JV Partner Update
29th Nov 20237:03 amRNSSuccessful Placement To Raise A$9.9M
28th Nov 20237:00 amRNSProposed placing to raise A$9.9 million
17th Nov 20233:11 pmRNSChange of Nominated Adviser
14th Nov 20233:09 pmRNSCorporate Presentation
13th Nov 20237:00 amRNSNAMIBIAN OIL AND GAS FARM-IN AGREEMENT
6th Nov 20237:00 amRNSHickory-1: BFF Maiden Contingent Resource Estimate
31st Oct 20237:00 amRNSQuarterly Report and Appendix 5B
30th Oct 20237:00 amRNSPROJECT PHOENIX – BFF CONTINGENT RESOURCE ESTIMATE
12th Oct 20237:00 amRNSAlaskan Portfolio Update
21st Sep 20237:00 amRNSHickory-1 Well Flow Test Planning Update
13th Sep 20239:30 amRNSSmall Holding Share Sale Facility Update
8th Sep 20237:00 amRNSHalf-Year Financial Report
5th Sep 20237:00 amRNSHickory-1 Well Flow Test – Rig Contract Executed
31st Aug 20237:20 amRNSDirector Dealings
30th Aug 202312:07 pmRNSCompletion of Rights Issue Shortfall Placement
29th Aug 20237:01 amRNSProposed placing to raise up to £4.5 million
29th Aug 20237:00 amRNSCompletion of Rights Issue
31st Jul 20237:00 amRNSProject Peregrine Prospective Resources Update
31st Jul 20237:00 amRNSInvestor Presentation
31st Jul 20237:00 amRNSQuarterly Report and Appendix 5B
31st Jul 20237:00 amRNSNon-Renounceable Rights Issue
3rd Jul 20237:00 amRNSAcquisition of Texas Oil and Gas Production Assets
27th Jun 20237:00 amRNSProject Leonis Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.