Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

Share Price is delayed by 15 minutes
Get Live Data
1.30    0.00 (0.00%)
Bid:
1.20
Ask:
1.40
Spread: 0.20 (16.667%)
Market Cap: £17.30m
88E Live PriceLast checked at - London Stock Exchange

Intraday 88 Energy Share Chart

Operations Update

21 May 2020 07:00

RNS Number : 5540N
88 Energy Limited
21 May 2020
 

 

 

21st May 2020

 

This announcement contains inside information

 

88 Energy Limited

 

Operations Update

 

88 Energy Limited ("88 Energy" or the "Company", ASX:88E, AIM 88E) is pleased to provide the following update related to operations for the recently drilled Charlie-1 appraisal well, located on the North Slope of Alaska.

 

The attached pdf - http://www.rns-pdf.londonstockexchange.com/rns/5540N_1-2020-5-20.pdf - contains graphics and information referred to in the following commentary

 

Highlights

· Average API gravity of liquid hydrocarbon in the Torok Fm confirmed as ~50 degrees

· Compelling indications of oil updip from Charlie-1 in Torok and possible intraformational seal identified, supporting geological model for alternate phase

· Oil interpreted in the Seabee at Malguk-1/Charlie-1 as well as updip at Heavenly-1

· Additional results from laboratory testing expected over coming weeks

 

Detail

Laboratory tests from fluid hydrocarbons retrieved from the Lower Stellar discovery in the Torok Formation have confirmed gravity of 49-52 degrees API, with an average of 50 degrees API. This gravity is near the typical crossover between volatile oil and condensate; however, constant composition expansion confirms that the phase at this location is condensate gas. The gas oil ratio ("GOR") as measured from the most representative sample is 17,000 - 23,500 cf per bbl. This may be higher than the actual GOR in the reservoir due to the sampling procedure and drawdown pressure. The main implication of having high GOR is that gas would need to be re-injected into the reservoir to maintain pressure during production, an already common practice on the North Slope for both oil development and at the Pt Thomson condensate stripping operation.

 

88 Energy originally preferred drilling location: Regional integration of early Charlie-1 results

The graphic in the attached pdf (Fig.1) depicts the preferred drilling location marketed by 88 Energy during the 2018/19 farm-out process. This location has several advantages over the Charlie-1 location, selected by the farminee, and will continue to form the basis of the ongoing farm-out for drilling on the acreage:

· Greater certainty of data due to the higher quality log suite obtained from the 2002 Heavenly‑1 well vs the 1991 Malguk-1 well, which encountered drilling / logging issues below 10,700' MD

· Located in more optimal thermal maturity window for generation of oil / volatile oil (Fig. 1)

· Evidence of oil in the Torok formation based on shows and oil saturations from side wall cores take from Heavenly-1 (Fig. 2,2a)

· More ideal intersection of targets in the Seabee formation where oil was observed from logs / shows / cores in Heavenly-1 in addition to the oil observed at surface whilst drilling Malguk‑1 (Fig. 3 and Fig. 4)

· Better continuity of reservoir and improved reservoir quality interpreted based on inversion interpretation

· More compelling impedance contrasts / high amplitude events on 3D seismic across Seabee and Torok formation targets

· Seismic inversion indicates that the Torok geobodies in the Heavenly area are likely separate to those in the Malguk/Charlie area, supporting geological model for different hydrocarbon phase (Fig. 5)

 

Media and Investor Relations:

 

88 Energy Ltd

Dave Wall, Managing Director

Tel: +61 8 9485 0990

Email: admin@88energy.com

Finlay Thomson, Investor Relations

Tel: +44 7976 248471

 

 

Hartleys Ltd

Dale Bryan

Tel: + 61 8 9268 2829

 

 

 

Cenkos Securities

Neil McDonald/Derrick Lee

Tel: + 44 131 220 6939

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLFFFSFEDIIFII
Date   Source Headline
21st Sep 20237:00 amRNSHickory-1 Well Flow Test Planning Update
13th Sep 20239:30 amRNSSmall Holding Share Sale Facility Update
8th Sep 20237:00 amRNSHalf-Year Financial Report
5th Sep 20237:00 amRNSHickory-1 Well Flow Test – Rig Contract Executed
31st Aug 20237:20 amRNSDirector Dealings
30th Aug 202312:07 pmRNSCompletion of Rights Issue Shortfall Placement
29th Aug 20237:01 amRNSProposed placing to raise up to £4.5 million
29th Aug 20237:00 amRNSCompletion of Rights Issue
31st Jul 20237:00 amRNSProject Peregrine Prospective Resources Update
31st Jul 20237:00 amRNSInvestor Presentation
31st Jul 20237:00 amRNSQuarterly Report and Appendix 5B
31st Jul 20237:00 amRNSNon-Renounceable Rights Issue
3rd Jul 20237:00 amRNSAcquisition of Texas Oil and Gas Production Assets
27th Jun 20237:00 amRNSProject Leonis Update
23rd Jun 20237:00 amRNSHickory-1 Flow Testing Program Update
11th May 20237:16 amRNSAGM Presentation
11th May 20237:16 amRNSAGM Results
3rd May 20239:04 amRNSAGM Voting Instructions
2nd May 20239:20 amRNSAGM Voting Status and Letter to Shareholders
26th Apr 20237:00 amRNSQuarterly Report and Appendix 5B
20th Apr 20237:00 amRNSProject Leonis Acreage Awarded
19th Apr 20237:00 amRNSHickory-1 Summary Presentation
11th Apr 20237:00 amRNSHickory-1 Well To Proceed to Flow Testing
6th Apr 20237:34 amRNSNotice of Annual General Meeting
3rd Apr 20237:00 amRNSHickory-1 TD Reached
29th Mar 20237:00 amRNSHickory-1 Operations Update
23rd Mar 20232:43 pmRNSNotice of AGM
23rd Mar 20237:00 amRNSHickory-1 Surface Hole Completed
10th Mar 20237:00 amRNSHickory-1 Well Spudded
8th Mar 20237:00 amRNSASX LODGEMENT OF ANNUAL REPORT
28th Feb 20237:30 amRNSFormation of Unit Approved Over Project Phoenix
27th Feb 20237:00 amRNSHickory-1 Pre-Spud Operations On Track
9th Feb 20231:58 pmRNSIssue of Performance Rights
6th Feb 20237:01 amRNSHickory-1 Operations Update
6th Feb 20237:00 amRNSPlacement to Raise A$17.5M
2nd Feb 20237:00 amRNSCorporate Presentation
2nd Feb 20237:00 amRNSProposed placing to raise up to A$15 million
25th Jan 20237:00 amRNSQuarterly Activities Report and Appendix 5B
24th Jan 20234:35 pmRNSPrice Monitoring Extension
15th Dec 20227:00 amRNSCorporate Presentation
7th Dec 20227:00 amRNSHickory-1 Exploration Well – Rig Contract Executed
28th Nov 202211:00 amRNSPrice Monitoring Extension
14th Nov 202211:05 amRNSSecond Price Monitoring Extn
14th Nov 202211:00 amRNSPrice Monitoring Extension
11th Nov 20227:39 amRNSResult of General Meeting
10th Nov 20227:00 amRNSNorth Slope 2022W Leasing Update
28th Oct 20227:03 amRNSUpdated Corporate Presentation
24th Oct 20228:00 amRNSQuarterly Activities Report and Appendix 5B
10th Oct 20227:00 amRNSNotice of General Meeting
10th Oct 20227:00 amRNSCorporate Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.