Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

Share Price is delayed by 15 minutes
Get Live Data
1.30    -0.025 (-1.89%)
Bid:
1.25
Ask:
1.35
Spread: 0.10 (8.00%)
Market Cap: £17.30m
88E Live PriceLast checked at - London Stock Exchange

Intraday 88 Energy Share Chart

Operations Update

21 May 2020 07:00

RNS Number : 5540N
88 Energy Limited
21 May 2020
Β 

Β 

Β 

21st May 2020

Β 

This announcement contains inside information

Β 

88 Energy Limited

Β 

Operations Update

Β 

88 Energy Limited ("88 Energy" or the "Company", ASX:88E, AIM 88E) is pleased to provide the following update related to operations for the recently drilled Charlie-1 appraisal well, located on the North Slope of Alaska.

Β 

The attached pdf - http://www.rns-pdf.londonstockexchange.com/rns/5540N_1-2020-5-20.pdf - contains graphics and information referred to in the following commentary

Β 

Highlights

Β· Average API gravity of liquid hydrocarbon in the Torok Fm confirmed as ~50 degrees

Β· Compelling indications of oil updip from Charlie-1 in Torok and possible intraformational seal identified, supporting geological model for alternate phase

Β· Oil interpreted in the Seabee at Malguk-1/Charlie-1 as well as updip at Heavenly-1

Β· Additional results from laboratory testing expected over coming weeks

Β 

Detail

Laboratory tests from fluid hydrocarbons retrieved from the Lower Stellar discovery in the Torok Formation have confirmed gravity of 49-52 degrees API, with an average of 50 degrees API. This gravity is near the typical crossover between volatile oil and condensate; however, constant composition expansion confirms that the phase at this location is condensate gas. The gas oil ratio ("GOR") as measured from the most representative sample is 17,000 - 23,500 cf per bbl. This may be higher than the actual GOR in the reservoir due to the sampling procedure and drawdown pressure. The main implication of having high GOR is that gas would need to be re-injected into the reservoir to maintain pressure during production, an already common practice on the North Slope for both oil development and at the Pt Thomson condensate stripping operation.

Β 

88 Energy originally preferred drilling location: Regional integration of early Charlie-1 results

The graphic in the attached pdf (Fig.1) depicts the preferred drilling location marketed by 88 Energy during the 2018/19 farm-out process. This location has several advantages over the Charlie-1 location, selected by the farminee, and will continue to form the basis of the ongoing farm-out for drilling on the acreage:

Β· Greater certainty of data due to the higher quality log suite obtained from the 2002 Heavenly‑1 well vs the 1991 Malguk-1 well, which encountered drilling / logging issues below 10,700' MD

Β· Located in more optimal thermal maturity window for generation of oil / volatile oil (Fig. 1)

Β· Evidence of oil in the Torok formation based on shows and oil saturations from side wall cores take from Heavenly-1 (Fig. 2,2a)

Β· More ideal intersection of targets in the Seabee formation where oil was observed from logs / shows / cores in Heavenly-1 in addition to the oil observed at surface whilst drilling Malguk‑1 (Fig. 3 and Fig. 4)

Β· Better continuity of reservoir and improved reservoir quality interpreted based on inversion interpretation

Β· More compelling impedance contrasts / high amplitude events on 3D seismic across Seabee and Torok formation targets

Β· Seismic inversion indicates that the Torok geobodies in the Heavenly area are likely separate to those in the Malguk/Charlie area, supporting geological model for different hydrocarbon phase (Fig. 5)

Β 

Media and Investor Relations:

Β 

88 Energy Ltd

Dave Wall, Managing Director

Tel: +61 8 9485 0990

Email: admin@88energy.com

Finlay Thomson, Investor Relations

Tel: +44 7976 248471

Β 

Β 

Hartleys Ltd

Dale Bryan

Tel: + 61 8 9268 2829

Β 

Β 

Β 

Cenkos Securities

Neil McDonald/Derrick Lee

Tel: + 44 131 220 6939

Β 

Β 

Β 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
Β 
END
Β 
Β 
DRLFFFSFEDIIFII
Date   Source Headline
31st Oct 20247:00 amRNSSeismic Processing Complete PEL 93
29th Oct 20247:19 amRNSQuarterly Report and Appendix 5B
10th Oct 20248:00 amRNSProject Phoenix Presentation
18th Sep 20247:00 amRNSContingent Resource Update for Project Phoenix
2nd Sep 20247:00 amRNS2024 Half Year Report
19th Aug 20247:00 amRNSProject Phoenix Update
31st Jul 202411:48 amRNSExercise of Performance Rights and Issue of Equity
26th Jul 20247:00 amRNSQuarterly Report and Appendix 5B
24th Jul 20247:00 amRNS2D Seismic Acquisition Completed for PEL 93
8th Jul 20247:00 amRNSCommencement of 2D Seismic Acquisition for PEL 93
4th Jun 20247:00 amRNSProject Leonis: Prospective Resource Estimate
22nd May 20241:59 pmRNSIssue of Performance Rights
13th May 20247:27 amRNSResult of AGM
10th May 20247:00 amRNS2D Seismic Contract Awarded for Namibian PEL 93
24th Apr 20247:00 amRNSSuccessful Placement To Raise A$9.9M
23rd Apr 20247:08 amRNSProposed placing to raise up to A$9.8 million
19th Apr 20247:00 amRNSFurther Information on Hickory-1 Flow Test Results
18th Apr 20247:00 amRNSQuarterly Report and Appendix 5B
17th Apr 20247:00 amRNSInvestor Presentation
15th Apr 20247:00 amRNSHickory-1 Flow Test – Second Light Oil Discovery
2nd Apr 20247:00 amRNSHickory-1 Upper SFS Zone Flows Light Oil
28th Mar 20247:00 amRNSNotice of Annual General Meeting
28th Mar 20247:00 amRNSLODGEMENT OF ANNUAL REPORT
25th Mar 20247:00 amRNSHickory-1 Flow Test Operations Update
11th Mar 20247:00 amRNSHickory-1 Flow Test Operations Commenced
1st Mar 20247:00 amRNSNotice of AGM and Deadline for Director Nomination
29th Feb 20248:33 amRNSIssue of Equity
28th Feb 20247:00 amRNSHickory-1 Flow Test Operations Update
22nd Feb 20247:00 amRNSNamibian PEL93 Working Interest Transfer Approved
19th Feb 20247:00 amRNSHickory-1 Flow Test Imminent
8th Feb 20247:00 amRNSChange of Auditor
5th Feb 20247:00 amRNSHickory-1 Pre-Flow Test Operations on Track
30th Jan 20247:00 amRNSQuarterly Report and Appendix 5B
15th Jan 202410:58 amRNSResult of General Meeting
12th Jan 20242:27 pmRNSIssue of Equity
12th Jan 20247:00 amRNSHickory-1 Flow Test Update
21st Dec 20237:00 amRNSProject Peregrine Update
20th Dec 20237:06 amRNSYear-End Shareholder Update
15th Dec 20237:00 amRNSAcquisition of Texas Oil & Gas Production Assets
14th Dec 20237:00 amRNSNotice of General Meeting
5th Dec 20237:15 amRNSProject Phoenix – JV Partner Update
29th Nov 20237:03 amRNSSuccessful Placement To Raise A$9.9M
28th Nov 20237:00 amRNSProposed placing to raise A$9.9 million
17th Nov 20233:11 pmRNSChange of Nominated Adviser
14th Nov 20233:09 pmRNSCorporate Presentation
13th Nov 20237:00 amRNSNAMIBIAN OIL AND GAS FARM-IN AGREEMENT
6th Nov 20237:00 amRNSHickory-1: BFF Maiden Contingent Resource Estimate
31st Oct 20237:00 amRNSQuarterly Report and Appendix 5B
30th Oct 20237:00 amRNSPROJECT PHOENIX – BFF CONTINGENT RESOURCE ESTIMATE
12th Oct 20237:00 amRNSAlaskan Portfolio Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.