The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picks88 Energy Regulatory News (88E)

Share Price Information for 88 Energy (88E)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.1425
Bid: 0.14
Ask: 0.145
Change: -0.004 (-2.73%)
Spread: 0.005 (3.571%)
Open: 0.145
High: 0.145
Low: 0.1425
Prev. Close: 0.1465
88E Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Hickory-1 Surface Hole Completed

23 Mar 2023 07:00

RNS Number : 9075T
88 Energy Limited
23 March 2023
 

 

 

88 Energy Limited

Hickory-1 Surface Hole Completed

Highlights

· Hickory-1 surface hole successfully drilled to 3,570 feet, cased and BOP system tested successfully.

· Operations progressing with Nordic Calista's Rig-2 now preparing to drill ahead.

 

88 Energy Limited (ASX:88E, AIM:88E, OTC:EEENF) (88 Energy or the Company) is pleased to report that the Hickory-1 surface hole was successfully drilled to 3,570 feet, the surface casing installed and cemented and the Blow Out Preventer (BOP) system tested successfully.

Nordic Calista's Rig-2 is now preparing to drill ahead, with the Hickory-1 exploration well expected to intersect the three primary SMD targets, before drilling ahead into the secondary SFS and BFF reservoirs targets. The KUP reservoir is a tertiary target and will be drilled subject to remaining time in the season, borehole conditions and other technical considerations.

The Company anticipates the primary and secondary target zones to be intersected within the next two weeks, before determining whether to drill ahead to the tertiary target and reaching permitted Total Depth (TD) of approximately 12,500 feet.

 

Logging while drilling and mudlogging are set to provide initial indications as to the prospectivity of the target zones at the Hickory-1 location. A sophisticated, targeted wireline logging program is planned to be run after reaching TD, which includes side wall cores (both pressurised and non-pressurised), triple combo, dielectric scanner and Nuclear Magnetic Resonance.

The wireline logging program is expected to take approximately five to seven days to complete. It is designed to gather extensive data which will be used to optimise the planned Hickory-1 flow test program scheduled for the 2023/24 winter season (subject to well results).

The Company will provide further updates subsequent to Hickory-1 achieving TD.

 

Figure 1: Nordic Calista Rig-2 at the Hickory-1 drilling location, adjacent to the Dalton Highway, North Slope Alaska.

 

 

 

Figure 2: Hickory-1 well designed to test up to 6 stacked targets.

 

 

This announcement has been authorised by the Board.

 

Media and Investor Relations:

 

88 Energy Ltd

 

Ashley Gilbert, Managing Director

 

Tel: +61 8 9485 0990

Email: investor-relations@88energy.com

 

Fivemark Partners, Investor and Media Relations Tel: +61 410 276 744

Andrew Edge / Michael Vaughan Tel: +61 422 602 720

 

EurozHartleys Ltd

Dale Bryan Tel: + 61 8 9268 2829

 

Cenkos Securities Tel: + 44 131 220 6939

Neil McDonald / Derrick Lee

 

Pursuant to the requirements of the ASX Listing Rules Chapter 5 and the AIM Rules for Companies, the technical information and resource reporting contained in this announcement was prepared by, or under the supervision of, Dr Stephen Staley, who is a Non-Executive Director of the Company. Dr Staley has more than 35 years' experience in the petroleum industry, is a Fellow of the Geological Society of London, and a qualified Geologist/Geophysicist who has sufficient experience that is relevant to the style and nature of the oil prospects under consideration and to the activities discussed in this document. Dr Staley has reviewed the information and supporting documentation referred to in this announcement and considers the resource and reserve estimates to be fairly represented and consents to its release in the form and context in which it appears. His academic qualifications and industry memberships appear on the Company's website and both comply with the criteria for "Competence" under clause 3.1 of the Valmin Code 2015. Terminology and standards adopted by the Society of Petroleum Engineers "Petroleum Resources Management System" have been applied in producing this document.

About Project Phoenix

Project Phoenix (88E 75.2% WI) is located on the central North Slope of Alaska and encompasses approximately 82,846 gross acres. It is situated on-trend to recent discoveries by Pantheon Resources Plc (LSE: PANR) in multiple, newly successful play types across top, slope and bottom-set sands of the Mid Schrader Bluff, Canning and Seabee formations. Independent mapping has demonstrated that these plays extend into the Phoenix acreage.

 

 

 

 

 

 

 

 

 

 

 

 

Figure 1: Project Phoenix lease area, including mapped play fairways, Franklin Bluffs 3D area and planned Hickory-1 well location.

 

Project Phoenix holds an estimated unrisked total of 647MMbbl of conventional prospective oil resources (mean unrisked, net to 88E), independently assessed by Lee Keeling and Associates (LKA) in Q3 2022 (see 88E ASX release dated 23 August 2022). The acreage has been significantly de-risked by the recent Pantheon drilling and flow tests on their adjacent acreage to the North, coupled with data from Icewine-1 well logs (encountered 380 ft of net oil pay within SMD sands) and a modern 3D seismic data set (FB3D).

 

 

 

Phoenix: Alaska North Slope

Unrisked Net Entitlement to 88E 1,6 Prospective Oil Resources (MMstb) 4,5

Prospects (Probabilistic Method)

Low (1U)

Best (2U)

High (3U)

Mean

COS3

Shelf Margin Delta (SMD A, B & C)

44

140

326

145

81%

Slope Fan System (SFS)

24

84

217

89

50%

Basin Floor Fan (BFF)

75

341

930

358

50%

Kuparuk (KUP)

24

56

98

56

72%

Prospects Total

 167

621

 1,570

647 2

 

 

1. 88 Energy net resources have been calculated using a 75.227% working interest and a 16.5% royalty.

2. The unrisked means, which have been arithmetically summed, are not representative of expected total from the prospects and implies a success case in all reservoir intervals. 88 Energy cautions that the arithmetically summed 1U estimate may be a conservative estimate and the arithmetically summed 3U estimate may be optimistic when compared to a statistical aggregation of probability distributions.

3. COS represents the geological chance of success as assessed by 88 Energy and reviewed and endorsed by LKA. 

4. Prospects are subject to a phase risk (oil vs gas). Chance of oil has been assessed as 100% for all targets except for the Kuparuk Formation which has been assessed as 70%. Phase risk has not been applied to the unrisked numbers.

5. The Prospective Resources have not been adjusted for the chance of development. Quantifying the chance of development (COD) requires consideration of both economic and other contingencies, such as legal, regulatory, market access, political, social license, internal and external approvals and commitment to project finance and development timing. As many of these factors are outside the knowledge of LKA they must be used with caution.

6. Please refer to ASX announcement dated 23 August 2022 for further details in relation to the prospective resources estimate and associated risking with Phoenix.

 

Cautionary Statement: The estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration appraisal and evaluation is required to determine the existence of a significant quantity of potentially movable hydrocarbons.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLEASDAADADEFA
Date   Source Headline
4th Aug 201710:24 amRNSInterim Report
19th Jul 20177:00 amRNSQuarterly Report
18th Jul 20177:00 amRNSIcewine#2 Operations Update
10th Jul 20179:05 amRNSSecond Price Monitoring Extn
10th Jul 20179:00 amRNSPrice Monitoring Extension
10th Jul 20177:00 amRNSIcewine#2 Operations Update
4th Jul 20177:29 amRNSIssue of Equity
4th Jul 20177:00 amRNSIcewine#2 Operations Update
26th Jun 201711:05 amRNSSecond Price Monitoring Extn
26th Jun 201711:00 amRNSPrice Monitoring Extension
26th Jun 20177:00 amPRNOperations Update
21st Jun 20179:40 amRNSIssue of Equity
20th Jun 20177:30 amRNSIcewine#2 Operations Update
19th Jun 20174:41 pmRNSIssue of Equity
19th Jun 20178:00 amRNSIcewine#2 Operations Update
16th Jun 20178:54 amRNSIssue of Equity
13th Jun 20178:00 amRNSIcewine#2 Operations Update
6th Jun 20174:40 pmRNSSecond Price Monitoring Extn
6th Jun 20174:35 pmRNSPrice Monitoring Extension
6th Jun 20177:00 amRNSIcewine#2 Operations Update
30th May 20177:00 amRNSIcewine#2 Operations Update
22nd May 20177:00 amRNSIcewine#2 Operations Update
17th May 20177:00 amRNSIcewine#2 Total Depth Reached
9th May 20178:31 amRNSIcewine#2 Drilling Remains on Schedule
3rd May 20177:00 amRNSIcewine#2 Drilling on Schedule
25th Apr 20177:29 amRNSIcewine#2 Drilling Commenced
7th Apr 20179:00 amRNSIcewine#2 Permit to Drill Issued
5th Apr 20178:57 amRNSChange of Registered Office
5th Apr 20178:01 amRNSQuarterly Report
21st Mar 20177:01 amRNSOperations Commence at Icewine#2
14th Mar 20177:39 amRNSCleansing Notice & Appendix 3B
9th Mar 20177:31 amRNSResult of AGM
6th Mar 20177:00 amRNSOversubscribed Placement to Raise A$17 million
2nd Mar 20177:00 amRNSASX Trading Halt and Proposed Capital Raising
17th Feb 20178:00 amRNSInvester Presentation
16th Feb 20178:00 amRNSRig Contract Executed for Drilling of Icewine#2
16th Feb 20177:00 amRNSASX Lodgement of Annual Report
7th Feb 201711:09 amRNSNotice of AGM
2nd Feb 20171:27 pmRNSInvestor Briefing
25th Jan 20177:00 amRNSQuarterly Activities Report and Appendix 5B
13th Jan 20177:00 amRNSConventional Prospectivity Review & Icewine Update
15th Dec 20167:00 amRNSAcquisition of Rights
2nd Dec 20167:00 amPRNOperational Update
31st Oct 20167:00 amRNSQuarterly Activities Report and Appendix 5B
27th Oct 20167:07 amRNSA$11m Placement - Cleansing Notice and Appendix 3B
25th Oct 20164:29 pmRNSRevised Admission Date of Placement Shares
25th Oct 20167:04 amRNSExecution of Agreements for A$11m Placement
18th Oct 20167:00 amPRNSignificant Conventional Potential Identified at Icewine
12th Sep 201610:46 amRNSIssue of Equity
5th Sep 20164:40 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.