Telfer, the new Tardis' Time Lord?4 Sep 2022 09:17
One aspect of the JV with NCM and the proximity of Telfer that many miss is the time element.
Telfer's demise has been put of thanks to the HAV discovery. The Need to get ore through the plant and keep it running (a shutdown would be mega costly to start up again) has forced NCM to find some more (low grade) ore at Telfer and has compressed that time it would normally take to get to HAV's ore. This is now the fastest underground mine from discovery to first ore. This many do now understand.
The real Time Lord trick will reveal itself soon!
Consider that Telfer timelines, some 35 years since discovery during which the plant and infrastructure (airport, village, power plant gas pipeline etc. etc.) has grown. The capacity of the plant has been increased over time to meet the throughput demands as grades reduced.
We are able to tap in (at minimal cost) to a fully functioning plant and infrastructure which will happily take every ton of ore that we can throw at it from day one. We do not have to invest the time and cash needed (over 35 years) to develop our own infrastructure to a similar standard. This is the marathon runner that sets off at his maximum pace and maintains the same pace up to the finish line, halving any previous records.
Yes, Telfer is our Time Lord, the levels of production that HAV can achieve from the first shovel full of ore will be impressive and far faster than than may would normally expect.