Exploration23 Mar 2018 08:38
As said, results due in "late April". No big revelations, but ME seemed pretty relaxed and confident.
1. Carbonatite pipes - yes, grades should be substantially lower in the pipe material, but the tonnage involved will be vast (one pipe has a diameter of 2700m). The carbonatite pipe material WILL require a different (i.e. more complex) kind of processing from the rare earth vein material.
2. Kiyenzi lopolith - if ME knows the results of that drilling yet, then he's a good poker player. But clearly there is "something" there, and the presentation booklet continues to take of a "sill-like anomaly potentially 22m thick, and 80m x 100m in size." I'd bet either on a lopolith, or a very tightly-packed network of veins.
The booklet also talks about a quick start to a second confirmatory drilling campaign in Q2 and Q3, leading to a JORC resource later this year. If you think about that, it means results in late April, probably a swift small capital raise to fund second phase of exploration, and a rapid return to exploration. This is a company confident of success.