A5 Deep Well document on X27 Apr 2024 17:49
In Adrianz's A5 Deep Well document on X it refers to ''Objects in the intervals 4,372-4,379m'', which is an interval 'depth' between the already perforated and highly pressurized 63m section (4,331m and 4,394m). The permit for testing this intervals start date is between 8 May 2024 and 6 June 2024.
The 'object' refers to 1.11 million m3 and I presume it refers to a gas quantity of 1,110,000,000 cubic meters of gas, which is equivalent to 17,550,000 barrels of oil - (Doc says - ''permitted volume of raw gas combustion'' so could be a gas column as 1.1 billions barrels is a 7m interval might be a bit too much ;-) (though it probably refers to flaring the gas off the oil?). So it looks like it's relating to flaring?. If it was oil they were referring 1.11 m3 would equate to 6,981,690 Barrels of Oil.
Is this 7m interval a gas zone? Could be.
In the last CASP Q & A session re the A5 Deep Well they said they were going to drill a new 400m sidetrack from a depth of 4,500m (4,500m-4,900m), which is way past the 63m perforated section, very strange when the 63m perforated oil column is between 4,331m and 4,394m even with a gross 105m net-pay column.
We'll soon see what this 7m interval is oil/gas and if it's just part of the 105m net-pay oil column they're supposed to be sidetracking again.
I can't see them only having a 7m target of interest when there's a 105m net-pay oil column, where some 63m of perforated intervals flowed an initial 3,800 bopd.
Anyway who knows, just doodling and thanks to Adrianz.
Cannot copy the document btw.