RE: Rns29 Jun 2026 16:15
Re 803 Deep Well:
''plan to perforate and test on cased-hole basis an interval of approximately 20 to 30 meters within the depth range of 3,927 to 3,977 meters''
''In addition, to seek to increase hydrocarbon production, the Company plans to perforate and test further intervals with aggregate thicknesses of approximately 8 to 12 meters within the depth range of 3,770 to 3,800 meters.''
So there's an interval within the 50 meter zone they are looking to drill into that's between 20-30 meters thick (about to poke it)- how far and wide does this interval stretch? could be a serious gusher, adding to a serious reserves upgrade.
And there's at least one interval between 8-12 meters thick within a 30 meter gross interval higher up to test between 3,770-3,800 meters.
These intervals are below the salt layer.
Also:
''Oil has been detected over a 60 meter interval between 3,360 meters and 3,420 meters, above expectations and also above the main salt layer. Testing continues over an interval now extended to 15 meters.''
This zone flowed up to 500 bopd from a 10 meter interval.
So overall at the very least 3-4 intervals to test..........................stick a couple of thousand barrels on the 500 bopd and game on!
''The planned deeper target interval has not yet been fully penetrated or tested. Accordingly, no flow from that planned target interval has yet been obtained.''
Last Thursday they were at 3,927 meters where the 20-30 meter interval starts, by the sounds of it they'd already started drilling into it. imo.