RE: Second Rig RNS1 Mar 2023 16:34
What's changed since this RNS was released 7 years ago? Take special note of 'Mineral resources are not mineral reserves and do not have demonstrated economic viability.' Am I missing something here, TalkingS&!t? Please correct me if I am mistaken.
Table 1:
Inferred Mineral Resource Estimate
Oxide Mineralization
Danglay Gold Project (EP-006-2011-CAR), Baguio District, Philippines
Effective date: 18 December 2015
Disclosed in accordance with Canadian NI43-101
Cut-off grade: 0.75 g/t gold
Domain Tonnes Grade (g/t gold) Gold (oz)
Danglay Ridge 387,000 1.73 21,500
Hillside 630,250 1.48 30,000
Bito 260,250 1.43 12,000
Total oxide 1,277,500 1.55 63,500
The key assumptions, parameters and methods used in the preparation of the above tabulated resource estimate are disclosed along with other items required under NI43-101 in the Report. The mineral resource estimate is disclosed at a cut-off grade of 0.75 g/t gold. The basis for the selection of this cut-off grade is set out in the Report. Figures have been rounded to reflect the relative accuracy of the estimate. Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resource will be converted into a mineral reserve.