RE: LCM - GreenX Metals25 Aug 2023 22:32
The below is probably the most interesting part of today's RNS;
"The Company completed a total of 21 holes drilled by IGPL and reported a JORC compliant mineral resource estimate of 38.5 Mt @ 1.4 g/t Au for some 1.74 Moz gold using a cutoff of 0.5 g/t Au (2008). The resource was updated in 2017 to comply with JORC 2012. Subsequently, much more work has been done on the project to demonstrate, with confidence, a much larger and more important gold deposit. The Geological Survey of India, an agency of the GoI, published a report in 2014 after the completion of over 150 drill holes (Bulletin Series A (April 2014)), wherein it reported reserve/resource estimates that far exceed the prior figure published by the Company. The report demonstrated the project's merit as supporting a large, low-cost gold mining operation with low stripping ratios and copper and cobalt bi-product credits."
To me that indicates they are likely going to pursue the 6Moz+ resource in the arbitration, even at $100/oz in ground value that's a $600m claim...
To gain more insight it's worth looking back at the PAT admission doc, particularly the competent persons report;
https://pantheraresources.com/wp-content/uploads/2017/12/Panthera_Resources_Admission_Document_171220.pdf
"3.10 Exploration potential
Mineralisation for both deposits is open in all directions. There is reasonable prospect that further drilling will identify additional mineralisation and this has been partially confirmed by GSI. As explained in Section 3.6, GSI has continued to undertake exploration activities over the project area.
In November 2014 the GSI published Bulletin #62 which reports on all work undertaken within the Bhukia PL area by the GSI. This includes the GSI’s own estimate of mineral resources based on their extensive drilling (42 942 m in 155 drill holes) which totals 106 Mt @ 2.0 g/t Au, 0.15% Cu containing 6.7 Moz gold and 160 000 t copper. While this is not a resource reportable under JORC guidelines, it represents a very significant exploration target."
+
"5.0 FUTURE EXPLORATION STRATEGY
Upside case scenario
- Focus will be to increase the JORC-compliant mineral resource estimate for the project to around 6 Moz gold or more to justify developing a very large open pit operation from the outset, instead of a staged mine development.
- This this will require a longer drill-out period, more detailed studies of all types, and more funding
- Commence scoping and feasibility studies in third year
- Also apply for ML in third year, if appropriate
- Total cash required will be minimum $30M over the three years."
Amazing that a £12m market cap can be in such a position...