RE: BushyTailed21 Jan 2022 14:42
Kaiser the new mine is funded with debt from Coris bank already. The CAPEX is $115m including pre-mining and $100m is already agreed. The production from Yanfolila should be above 100,000 pa as they are now mining the high grade Gonka deposit with another excavator to ensure ore volumes. This should lower AISC considerably, hopefully in the 1200-1300 range as an approximation. The figures you have quoted for the reserves are incorrect by more than an order of magnitude. That was just the increase in reserves with the last update. The next update will include 40,000m of drilling and if you look at the intercepts it should be a substantial increase. Then there is the imminent DFS on Dugbe and its 4M ounces.