RE: These are the facts:20 Jan 2022 12:10
That Energy Voice article was pretty damning:
"“This is a disaster in my opinion. I am not sure how they will spin it. They are no further advanced than the previous operator. There is no vast attic accumulation. As I had thought, the (FWI) reprocessing by DUG was not done with proper geological input. The 80m low to prognosis is a terrible result,” one industry expert told Energy Voice."
“80m low to prognosis means 80m of oil column was not present. Substantial resource volume was not present. It is disappointing from a technical standpoint. Carnarvon will need to make a judgement about whether a commercial project remains, given the on-going technical uncertainty,”