RE: ACOES2 May 2020 19:38
15,000bopd extra expected.
"Once commissioned, the system is expected by Eroton to reduce the downtime and allocated pipeline losses currently associated with the Nembe Creek Trunk Line ("NCTL"), which were responsible for the majority of the 15,000 bopd difference between gross production when the pipeline is running, and average sales oil. In addition, it is anticipated that the FSO project will improve overall well uptime." RNS 30.9.2019