RE: Pain20 Jul 2021 17:00
" in regard to"
How do you plan a standard production test after a hydraulic fracturing stimulation:
You sit together with the colleagues from the different departments, drink a coffee and discuss the scenarios you could expect
A) a perfect well that means without any extra help you get a nice , permanent flow rate above the critical velocity
B) after every frack you have to expect some proppants (that could cause a flow restriction or even plugging the well, especially in a horizontal well) and you expect some spent frac fluid that has to be lifted. So you prepare stand by equipment and even we here got enough hints that there is a very high probability that we get this scenario after the second trial.
C) you discuss and think about other usefull tools like logging tools etc and you give the logging company a phone call that they are prepared to be at the well site within 24 h when you need them etc.
I really do not know if this guys are just dumb or if Org management has given up this well and does not support the operational guys with enough funds and resources?