RE: 3 ships in within 3 days, for H & W Belfast17 Nov 2021 18:31
noisyboy9 Polar onyx is due to leave on 20th Nov
Think it is a bit more than crane failure as she is in drydock rather than ship repair quay and she suffered from limited manoeuvrability whilst at Meygen site
Hope that helps