RE: Production26 Oct 2018 14:37
ROS, I hope PMO are producing much more than 80KBOED now. If they produced 76.2 KBOED in first half, that's 13.87mboe for the half year
Guidance
80 KBOED is 29.2MBOE/Y
85 KBOED is 31.025MBOE/Y
Math for the production limit required for 183 days in half 2. I have 83.7 to 93.7. So 80 in half 2 just doesn't cut the mustard.
can someone check if I'm right, to achieve the lower figure in second half would be very high production, the upper figure or somewhere in between would mean that next year will be guiding high 80,s.