RE: Geo top person... where are you??15 Jan 2022 19:11
EnergyGeo even though you weren't away long it seems like a while, testament to your well written, forensic posts in a style that unravels the complexities for us laypeople. Many thanks.
Now about that 8 1/2" hole. When they find the oil, as almost surely they will, do they use a smaller pipe should they go into
production, as almost as surely they will? I say this as they have talked about a 5 1/2 inch tubing for production, just for future reference please.
Secondly CVN have simulated the OWC as being 26m higher following the original development at 3290m. Why would they have a total drill depth some 210m beyond that? Trying to work out if that's to offset a margin of error in the geology forecasting and if so would the same margin be applied to the top level of the reservoir?
What do you mean by the term 'They will need to make a decision on completion of the well ...' and could this in any way tie in with the slight but noticeable difference inserted by ADV in the otherwise exact announcements of 22nd Dec.
CVN - 'Once the oil column encountered has been determined from wireline logging, the Buffalo-10 well will be suspended....'
ADV - 'Once the oil column encountered has been determined from wireline logging, the Buffalo-10 well will likely be suspended....'
Again thanks for your help.