Group Revenue increased by +236% in Q1 20223 May 2022 21:03
Baita Plai mine -
Production increased by +24% vs previous QTR.
Q2 Production & Revenue numbers outlook should be even better.
Company said:
"Mining activities are epxcted to see a significant tranformation with the implementation of two Mantis CMR4 Jumbo Drilling rigs and the Aramine miniLoader L130D with remote control capability.
With the two new Mantis drills and the transition to mechanise mining together with the implementation of long hole stope mining, significantly increased production output should be achieved, and then the focus will turn to the plant to increase its capacity in order to process more tonnes."
"All the basic infrastructure for the mine is now in place and the Board believes that with the increase in production the mine will become a profitable asset, with many additional surrounding skarn deposits waiting to be exploited."
"Furthermore, the presence of bismuth and molybdenum highlight the mine’s strategic value. The processing plant has undergone modifications with the introduction of a molybdenum flotation circuit. Final commissioning of the molybdenum circuit is expected to take place during Q2 2022.
The changes outlined above are forecast to result in substantially increased production of copper concentrate, commencing in June 2022, and are expected to be reflected in results from Q3 2022 onwards. "
On a personal note, i think todays extremely positive Update took Market by total surprise. Substantial Upside with lot more to come. Crazy low Mcap even after todays rise from all time lows