'Phased development plan
Helium One is proposing development of the Itumbula discovery in phases, with initial 5 development wells being brought on to production using an Early Production System (EPS). The next phase of 15 wells will ramp up productionmaterially through a Central Processing Facility (CPF), with a further 46 wells
required for the full field development.
The EPS is conceptually similar to the full development, but with lower initial capex outlay. Production wells will be tied back to the EPS, where produced fluids will be processed into sales helium for export, and wastewater for disposal, with waste gases vented on site. The EPS is assumed to operate for six months before the full development project is commenced.'