'Phased development plan
Helium One is proposing development of the Itumbula discovery in phases,
with initial 5 development wells being brought on to production using an Early
Production System (EPS). The next phase of 15 wells will ramp up production
materially through a Central Processing Facility (CPF), with a further 46 wells
required for the full field development.
The EPS is conceptually similar to the full development, but with lower initial
capex outlay. Production wells will be tied back to the EPS, where produced
fluids will be processed into sales helium for export, and wastewater for
disposal, with waste gases vented on site. The EPS is assumed to operate for
six months before the full development project is commenced. The CPF will be
of larger scale and will be able to handle substantially greater fluid volumes'