RE: Silence19 Jul 2023 14:38
I'm not sure the FM can be voided by needing another bit of equipment.
At the end of the day, Prem ordered a plant capable of producing SC6. This has not yet been delivered and needs tweaking.
Clearly the raw ingredient in the ground, having been tested by several parties are up to it, as let's face it, Canmax would not be putting in £34M plus 11% shareholding without checking this independently themselves.
The added benefit, is that once Stark has got this plant up and running to SC6 standard, it should also be more efficient than originally thought and be able to produce well over the original design spec of the end product at the desired quantity.