RE: Dissapointed24 Mar 2026 11:49
Interesting Hydras - my basic search showed the following info, anyone can let me know if any of this is not correct:
The largest data center project currently under construction is the Joule Power campus in Millard County.
The Power Plan: Joule is building "behind-the-meter" power, meaning they aren't waiting for the electric grid. They are installing massive arrays of natural gas generators to provide up to 1 GW (1,000 MW) in Phase 1.
Joule has confirmed they are connecting directly to the Kern River mainline, a major natural gas pipeline that runs through Utah.
Paradox's Role: The Paradox Project's primary goal is to export gas into the existing regional infrastructure. Since Zephyr Energy’s wells (like the State 36-2R) are near Green River and tie into the regional export network, the gas they produce becomes part of the "pool" that feeds the Kern River line and, ultimately, the data centers' generators.