RE: 88 Team + BEX Team = FO deal12 Apr 2019 16:13
We've only drilled 2 holes that failed to provide enough juice for a flow test - the average is 1 in 4 with modern seismics, and the last one was using old seismic analysis from old data (not our call).
SO, only one drill that has been from our own analysis and design has failed to produce a flow test (though we now have a pretty good idea why,) and should do better next time. The bottom line is that we are an exploration company, and a few wrong turns on the journey is to be expected. I'm disappointed that we had a fail this early - prefer they were evenly dispersed over our drilling plan after some early successes, but that's life.
If DW has secured the funding and participation of a cash-rich partner, he should be able to accelerate that plan (hope to see more 3 holes within 12 months).
Unfortunately, the place those holes are drilled may be at someone else's behest - we can but wait. First will come the announcement, later the plan and 6+ months later, the action. Nothing is instant, although there are other deals and results due this year which will fill the voids, and hopefully boost the sp (though my hopes of double digits by Christmas is fading).
ATB.