Get rich, Merc did the same as me, toned it down a bit and put our money to working for us instead of show. Best thing I ever did too. Now no matter how much I make it will not show.
These plans Kodal are submitting are really technical. Hopefully they will be finished soon.
Mines need loads of water, so it is no surprise we are near a river. The plans are changed from a large flotation plant down to a DFS plant, with a flotation plant following. Total over 300,000 tonnes output. The DMS plant creates middlings, part rock part lithium which will need crushing and putting through the flotation plant. So the plans alter the existing site to accomodate the DMS plant, everything that stock piles to go in, spod out, tailings out and middlings out. Everything that comes out is wet and needs to drain and remove sediment. However in countries that have monsoons creating drainage so that water does not add to the tailings, Spod or middling water is complicated, then also you have the issue of the river rising, you don't want that to carry anything into the river, but when the river rises drainage is more complicated, the water must be taken away, our river drains near roads have a huge value, heavy swinging round door looking device, which shuts when the river rises, Mines can't do this as the rain water needs keeping out of their sediment ponds etc. I saw in their technical drawings that they are creating a huge burr to raise everything to ensure this does not happen.
This is the same with every mine, nothing new, but you get the idea of what they are working on.
The middlings storage area will be large as a flotation plant takes a while to build. In addition the layout will be different to work with the flotation plant when built. Big optimization task, should be finished soon as they have been working on it for a while, Hainan will be looking at it all too as they carry liability with us.