Further to my post26 Sep 2019 10:12
About ONGC's latest tenderdoc, in addition to the revelation that they intend to drill 3 to 4 wells in the next 1 to 2 years there is also a preamble to the Scope of Work which somewhat contradicts things. Listing 8 wells minimum for possible back to back drilling in the next 1 to 3 years!
That sounds like the blue sky aspiration (for a decent operator what is easily possible) whereas the lower figure is the plan, make your own judgement.
Much more importantly is the list and it's order, specifically the first 4 names -Indico-2, Indico-3, Aguila-1X, Mariposa-2.
If the order is the proposed order of drilling and I think it is clearly a sensible assumption, 3 of the first 4 wells are relative bankers which potentially extend the reserves base and production massively, Aguila-1 is a surprise and maybe completes a geological picture before taking the plunge with Pavo Real-1 which originally should have been the next well.
Pavo Real-1 the potentially huge but I suppose more risky prospect is demoted to 5th position, we'll clearly never see most if any of these drilled but the uplift in production and reserves will likely make whatever we get for the block look woefully inadequate. Even Indico-1 and 2 should with any luck add 10000bpd to CPO-5 block production, it's a crying shame we've been done like a kipper here guys..
No point thinking about the other lost opportunities, any could have been company makers, Mirlo-1X, Alca-1X, Flamenco-1X etc. - though I guess potential buyers will assess their value in considering an offer price.
"Based on the seismic survey in CPO-5 block, a number of prospects have been identified for drilling in various parts of the block. The following future wells indicative names are Indico-2, Indico-3, Aguila-1X, Mariposa-2, Pavo Real-1, Mirlo-1X, Alca-1X, Flamenco-1X etc. Proposed wells have been identified preferably for back-to-back drilling within the next 1-3 years and the services may not be restricted to specific name of well but utilized for wells are on priority of work. The upcoming activity includes LTT of Sol-1 "