RE: SCC Planning Permission30 Apr 2018 12:40
Nianjabi
The planning application being heard on the 23rd May includes the gas to wire installation. It is for a maximum period of 3 years. Once Angus are happy they will then apply for production from this well. They already have OGA approval. My guess is this will be way short of the 3 years applied for.
(The retention of the BRX4 well, the regularisation of the BRX4Z sidetrack, and the appraisal of BRX4Z using production plant and equipment within the existing site, for a temporary period of three years (part retrospective). )
(Gas Utilisation
The produced fluids will contain gas, which will be separated from the oil and water and utilised to produce electricity and in local process heating. The power generated will be used to meet the site�s electricity requirement, with any surplus exported to the grid.)