Chris Heminway, Exec-Chair at Time To ACT, explains why now is the right time for the Group to IPO. Watch the video here.
Portland appeal for incinerator - 5 months
HH -1 improvements
HH-2Z reinjector
HH Supreme Court appeal
Loxley farm in
New well Türkiye
Loan reduction update
With only 507,193,103 shares to get rid of before the AGM they are never going to get rid of the first £2m tranche before then. And the suckers are still buying.
UKOG
@UKOGlistedonAIM
·
13h
UK ENERGY STORAGE LTD: There's plenty in store
UKOG
@UKOGlistedonAIM
·
16h
ANNUAL GENERAL MEETING to be held on 29th May 2024 at 11am
https://ukogplc.com/ul/UKOG%20%20AGM%20notice-%20final.pdf
UKOG
@UKOGlistedonAIM
·
17h
ANNUAL GENERAL MEETING on 29th May 2024 at 11am. https://tinyurl.com/4dxhtp2r
"Resolution 5
is proposed as a special resolution. This means that for Resolution 5 to be passed, at least three quarters of the votes cast must be in favour of the Resolution."
At the GM Resolution 4 was a special resolution and wasn't far off from failing. It would not take much for some large shareholders, or even concerned PI's that actually could be bothered to vote, to sway the vote the wrong way.
This is called "putting the boot in".
Total voting rights 19. As at 2 May 2024, being the last practicable date before dispatch of this notice, the Company’s issued share capital comprised 3,875,842,538. Ordinary Shares of £0.000001 each. Each ordinary share carries the right to one vote at a general meeting of the Company and, therefore, the total number of voting rights in the Company as at 2 May 2024 is 3,875,842,538.
UK onshore oil and gas production in charts – February 2024
UK onshore gas production dropped in February 2024, reflecting an 18% fall in output at the biggest producer, Saltfleetby.
Daily onshore oil production rose 2%, despite a 28% drop at Wressle, the country’s newest onshore oil producer.
Full article here;
https://drillordrop.com/2024/05/03/uk-onshore-oil-and-gas-production-in-charts-february-2024/
Reporting Period Month Name February 42 bopd
Oil Production Mass (tonnes) 162.432
m3 192
Associated gas production mass (tonnes) 5.293
Associated Gas Production Volume (ksm3) 5.947
Gas Flared - Volume (Ksm3) 5.947
Gas Flared - Non Hydrocarbon (%) 4.5
Water production volume (ksm3) 151
Reporting Period Month Name January 44 bopd
Oil Production Mass (tonnes) 181.89
m3 215
Associated gas production mass (tonnes) 5.418
Associated Gas Production Volume (ksm3) 6.088
Gas Flared - Volume (Ksm3) 6.088
Gas Flared - Non Hydrocarbon (%) 4.5
Water production volume (ksm3) 165
Reporting Period Month Name December 45 bopd
Oil Production Mass (tonnes) 188.658
m3 233
Associated gas production mass (tonnes) 6.755
Associated Gas Production Volume (ksm3) 7.59
Gas Flared - Volume (Ksm3) 7.59
Gas Flared - Non Hydrocarbon (%) 4.5
Water production volume (ksm3) 168
Reporting Period Month Name November 44 bopd
Oil Production Mass (tonnes) 176.814
m3 209
Associated gas production mass (tonnes) 6.124
Associated Gas Production Volume (ksm3) 6.881
Gas Flared - Volume (Ksm3) 6.881
Gas Flared - Non Hydrocarbon (%) 4.5
Water production volume (ksm3) 185
Month bopd
Mar 23 54
Apr 23 46 Tank washing
May 23 57
Jun 23 56
Jul 23 50
Aug 23 46
Sep 23 48
Oct 23 45
Nov 23 44
Dec 23 45
Jan 24 44
Feb 24 42
Receipts for February $83.76 x 42 x 28 = $98,502
Receipts for January $80.23 x 44 x 31= $108,426
Receipts for December $77.86 x 45 x 31= $108,615
Receipts for November $83.18 x 44 x 30= $109,349
Receipts for October $91.06 x 45 x 31= $127,029
Receipts for September $94.00 x 48 x 30= $135,360
Receipts for August $86.16 x 46 x 31= $122,864
Receipts for July $80.11 x 50 x 31 = $123,957
Receipts for June $74.89 x 56 x 30 = $125,815
Receipts for May $75.70 x 57 x 31 = $132,738
Receipts for Apr $84.11 x 46 x 30 = $115,801
Receipts for March $78.53 x 54 x 31 = $132,451