RE: Interims22 Sep 2025 21:53
From the 3rd Sept RNS:
The work programme includes:
· 31 trenches of 100 metres each (3,100m total), with 24 scheduled for completion by the end of September 2025.
· An 1,800-metre reverse circulation (RC) drilling campaign, focused on TP02, commencing in October 2025 and lasting ten weeks.
· Topographic and geophysical surveys, as well as chemical analysis of over 600 historic samples, with 10% subject to QAQC verification.
· Ongoing collection of grab samples, with assay results expected within the next four to five weeks.
_________
I’d expect an update a bit later than this week, perhaps next week.