RE: Share price...7 Aug 2022 18:39
Tanz,
Pipeline.
"Aminex Plc’s AGM presentation in May 2022 anticipates “first gas” for the Ntorya development by the end of 2024 and targeted production of 140 MMcfd (million cubic feet per day) - a significant increase when compared to existing national production (128 MMcfd in 2020). It also highlights the importance of existing infrastructure (including the 36 inch gas pipeline from Mtwara to Dar es Salaam with the capacity to transport 784 MMcfd) and planned infrastructure (in particular, the pipeline from Dar es Salaam to Mombasa)."
https://www.pwc.co.tz/press-room/why-tanzania-why-now.html
And the CH-1 plan before ARA took over:
"Upon success at Ntorya 3 the company envisages an Early Production System (EPS) at the well and some remediation work at Ntorya 1 and Ntorya 2 with pipeline to Madimba gas plant."
"According to io’s report a gas development project at Ntorya could be viable with three wells Ntorya 1, Ntorya 2 and Ntorya 3 producing into a raw-gas pipeline to the Madimba gas plant, approximately 33 km away."
https://www.oilnewskenya.com/ntorya-3-ready-spud-h2-2018-ntorya-field-declared-commercial/
And this:
"Mtwara–Dar es Salaam Natural Gas Pipeline"
"The main pipeline from Madimba in Mtwara Region, to Dar es Salaam, measures 36 inches (91 cm) in diameter. At Somanga, in Lindi Region the main pipeline is joined by a smaller 24 inches (61 cm) pipeline delivering natural gas from Songo Songo Island. Both processing plants, one in Madimba and the other in Songo Songo are two trains (processing units) each and together are capable of processing 350,000,000 cubic feet (9,910,896 m3) of natural gas every 24 hours.[2]"
https://en.wikipedia.org/wiki/Mtwara%E2%80%93Dar_es_Salaam_Natural_Gas_Pipeline