RE: 3D Seismic results10 Aug 2022 14:25
That is surely why they chose to get interim Seismic results over the CH-1 well before the end of August, so they have the time to build a new well pad and still get the spud done in November, IF required. That is just simple risk management by ARA.
We know from the way the 3D Seismic has been done (loads of locals recruited to clear tracks, a lot of nodes and trucks, etc) that ARA are on the ball, so a new well pad should not cause any delays with them running the show. They probably have a team waiting on standby in case they need to do it.
Many still look at the Ruvuma project and think it's AEX running it LOL! ARA are running it and doing an outstanding job of it so far.
Many say they'll never put money into AEX based on the AEX history, but investing in AEX is actually investing in ARA, a completely different ball game.