RE: I won’t be happy with anything less than 20p3 Jun 2020 11:30
The critical thing now for the SP is not Halifax, Lincoln, or any other fields. It is the next ops update RNS which will tell us how far the co has ramped up production from the 6 well above the current (22 May) 10,300bpd.
Given the known PIs it should be capable of 15,000 bpd or even more ; but we don't know if its proximity to 7x might draw harder on the known water pocket ; if it might , by drawing harder, and possibly from a longer section, find another water pocket ; etc, etc.
Being so reliant on a single well, means the co, and any investment here, is exposed to a high level of uncertainty, which is why I have only cautiously ventured in.
Should the well perform as expected, tho, and produce at 15k+ bpd for a period, then as long as PoO remains stable or improves, the co can think again on drilling, and mb expedite a Lancaster drill this year.
extrader
TBF to HUR PR, they can't really tell you anything not in public domain, so I guess that's why they refer you to CMD, etc.