RE: For those who don't have X17 Oct 2024 14:05
Yeah, could be that too, hence why I said pity they didnt show the rig from the opposite angle so we could see whether the casing was still racked. Casing run when done in stands of 3 instead of individual pipes would be fairy quick at the depths we a re looking at, maybe as few as 25 casing joints performed while running them in. As I said the other day, 1 shift may even be enough to get the casing in. Drill pipe in the picture is still in singles so maybe they are making up the stands in advance of extending the well -