RE: RE: Two new tweets15 Feb 2019 14:20
JSB.. I somewhat guess at 10-14 days to get it all assembled and connected up to mud, shakers, power supply, pipework--BIG oil storage tank lol.
If we ever get that BQ500--I have doubts that we will and tbh hope we don't, then the set up time is a few days--it sort of folds itself out of the box so to speak. This one needs a few folk with spanners by the looks of it-although I have no direct knowledge about it really.
Speak to AJ, he seems to know :) funny thing is, it wont be 'contractors' as such and it wont be Zen either !!. It is supposed to be under control of the supplier B Robotics.