RE: Re : price5 Mar 2019 15:55
There seems to have been some 'erroneous' messages centred around whether it is Q1 or H1. I understood Q1 was relating to Norio but H1 was relating to W.R. I do however recall Sidetracks being associated with Q1 in a 'message' or an interview or somewhere which was assumed by some to mean W.R, but personally I always viewed it as H1 for WR on the basis that I am reasonably aware of how tings work in Drilling and there was no way to drill two sidetracks, and horizontals, cementing, running completion, logging, stimulating and getting the blo**dy things flowing within the Q1 with one rig set up. 16a may have been possible but on a really stretched target and a magic wand. We should still get Norio and a feel for what to expect from WR based on what they are getting back in the shale shakers and behaviour patterns of the rig. e.g any pressure kicks, increased resistance, reduced resistance, WOB, ROP, etc.
All good so far though (I think lol)--a Norio update would be nice to have even if it is incomplete. GLA