RE: When ~10 Nov 2022 15:26
Don't get too excited. Gas plant and pipework may need overhaul, recommissioning, inspections and sign-off by local govt inspector. It will need a new pipeline and tie-in to accept gas from 16-2 which may need some kind of permission, be built to an approved design, and signed off for use following inspection. 3-6 months at a guess before it's fully usable. Just my opinion so could be mies off. In the meantime, 30-60 days testing 16-2 with news updates, confirmation of drill spud and updates along the way, casing points, kick-off point to horizontal, vertical TD, full TD. oil shows, stimulation, gas, pressure, Christmas tree (probably around Christmastime), rig-off, well testing, oil storage tanks. Rig ready for the next well, get that drilled and completed, eat some easter eggs and off to the races, connect up to the gas network, forward sell the 'orl', bring in the tanker trucks. New non-op wells coming online, $100m plus a year income by next Summer. Pay off the debt, Mcap 500m SP 25p.