RE: reso. If we get the permits to28 Jul 2018 01:44
reso.
Ok, big assumption, but nevertheless. In my opinion, it will not have a positive effect on the 'SP', until the costs associated have been confirmed, then proof that the re-stimulation has significantly improved production capability. Could all be in vain and have zero effect on flow rates
. What will happen to the 'SP' then? Every move is currently a big gamble here.
--------------------------------------------------
Hello. Fair enough. My opinion is if they grant the permits for re-stimulating the existing 2 wells it sets a precedent, as in they are likely to grant permits for the rest of the wells when they are applied for. I think that would be massive good news for Ascent. Clearly being able to re-stimulate the wells is key to the gas field being commercially viable. My opinion is it's highly likley the gas field will be commercially viable provided the wells can be stimulated or dare I say the word fracked. Fracking is not banned in Slovenia. In fact it has been carried out for decades. Apparently it's not fracking in the USA massive industrial scale of course. Far, far smaller scale.
To me it is highly likely the permits will arrive as there is no reason why they should not. I expect the sp to recover to 2p ish levels once the permits are received. Assuming they are received I think a jv is extremely likely (probably with INA). Once thet news is out I think we will be back to around the 2.5 to 3p level.
We will be finding out soon I think.
All IMHO.