The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.
adoubleuk
Not going to plan doesn't just infere the planning is spot on, i mean unforeseen events, weather conditions, S92 bus availability,
isolation integrity, drain blockages for system prep, leak test failures, systems not souring off after preparation, all these are not part of planning & are therfore not known until executed, if the plan doesn't go as planned could defer work & restart on the restart date for that plan, I won't be here then to view any flare, off for a few weeks field break
Unsure whether she be back up & producing by the 11th & the RNS most offshore outages never go to plan
this evenings view - no flare
https://ibb.co/Bc5Zh22
DiveCentre
Intrinsically safe ipad zone 0, all good & very expensive
Tiptop43 no not Solan ??
Didnt want to issue this one
but for all the non believer's
https://ibb.co/zPzK17P
Gla
slift
not personally, but you get my drift now, i can see her most evenings ;) so i know a bit
https://ibb.co/hCwfPZ2
Photo AM & Tanker
Navion Oceania on the stern off AM FPSO commencing offload no doubt, flare steady burn, lovely photo, if you want to see my view mail my user id at Hotmail com I will send you the evening view
she was flaring last night, looked a bit more aggressive than usual, if she has production issues or equipment issues the offload tanker will sit off and wait instructions to enter for rocket line deployment, I will have a look see soon, joys of nightshift
Millions
4 to 6 wells, i have said before on here, a bigger fpso is required to handle the production, especially the produced water handling capacity imo
Gla
Gas reinjection serves 2 purposes here, aid lifting & more importantly reservoir pressure, water injection in this scenario isn't ideal due to, 1 current water cuts of both Wells, 2, the water handling capacity of AM Fpso @ 30k barrels/day, water injection recovery is 3 to1 water to oil, that would be a very water wet reservoir then, 3 no infrastructure subsea to inject water, same applies currently to gas reinjection
Gla
Gas injection yes, would need a riser a flow line a subsea manifold & a well to put it down, now what to do with the returned gas ? Burn it up the chuff ? So would also need a reinjection compressor or topsides rework of piping & equipment, none of these are cheap tasks at all.
Gla
flare is lit steady burn vessel is online @ what rates or number of Wells is anyones guess
Gla
NTR tonight, too foggy, upside quite a few minke whales having a frolic in the calm WoS waters, oh & the shytehawks doing some bombarding of them breaking surface, quite a pleasant view this evening tbf
So now, there are two AM's there's Aoka Mizu & Antony Maris, or is that Aoka Maris or Antony Mizu ..... **** I'm fried, oh well best get to the nightshift, can't be as bad as the last CEO, Bev the mute
i see a biggish flare, i cant be 100% sure its her (AM) its a tad foggy out here, but the trajectory line appears near, if this 100% the case then production is taking place via how many of the 2 wells i have no idea
gla
Gas cap - would flow first due to density & would be flared off, this reservoir needs sustainability which is either gas lift or water injection, 2 issues here, no gas lift riser / manifold or subsea pipeline & secondly AM cannot handle more than 55mbd produced water returns & doesn't have a riser/ or reinvention pipeline either, recovery sustainability is 3 to1 water to oil