RE: Accugas23 Feb 2021 00:07
Apparently very high voltage, low current DC lines have much less transmission loss than lower voltage, higher current AC lines. It looks from the map like it’s around 1,000km from Calabar to Togo; I guess, after researching a bit, it must be doable.
Looking at the cumulative revenue graph from the latest presentation, Calabar is already a very big chunk of the guaranteed revenues. Exciting times...