RE: Oracle25 Jul 2025 15:14
I read the report they have equipment on order
This isn’t a quick fix
So maybe you need to revisit the report
The manufacturer, Andritz, is currently working with the Company to optimise the filtering plant, with the current expectation being a phased ramp-up in its operation during H2 2025 to achieve the required performance levels. The team is also considering installing a tailings thickener to improve the feed into the filtration plant.
Do you not understand ramping up in H2
So if they produced than in H1 it’s prob best to lower your estimates you clearly have no mining knowledge
I have been investing in miners 15 years
That kind of problem takes time to sort and ramp back up trust me
If you want to be optimistic have a range of 40,000-60,000
Either way Brazil won’t make any money this year