RE: And the SP has done absolutely.....19 Jul 2019 16:41
20-25 container sized units on site at Broadford Bridge for the whole site operations. Is HH and empty site? - there is already similar levels of kit at HH. Prep works have already been completed. It seems now that the rig is the next bit of equipment to arrive, and the basic unit could come in on a single truck over the weekend. Obviously the required equipment for the drill will arrive after this, but we only need one rig unit to say 'the rig has arrived'.
The eyes need to keep a lookout Saturday 09:00 – 13:00 when we have permission for HGV movements
https://www.ukogplc.com/images/assets/HHDLProduction%20HGV%20Movements.pdf
Just a reminder:
Wev have planning permission for :
The retention of the existing exploratory well site and vehicular access onto Horse Hill;
The appraisal and further flow testing of the existing borehole, Horse Hill-1 (HH-1) for hydrocarbons, including the drilling of a (deviated) sidetrack well and flow testing for hydrocarbons;
Installation of a second well cellar and drilling of a second (deviated) borehole, Horse Hill-2 (HH-2) and flow testing for hydrocarbons;
Site preparation including erection of security fencing on an extended site area, modifications to the internal access track, installation of plant, cabins and equipment
The Environment Agency (EA) has granted the necessary permits to enable HHDL to carry out extended flow tests at HH-1, store any produced oil, drill and test both a sidetrack from the existing HH-1 well and new borehole HH-2
We have a pending (September) application for :
4 new production wells,
six surface pumps (one for each producing well)
A new process and storage area with capacity for 9,100 bls
4 Gas to power electricity generators (see new separator on site)
Good times ahead