Development plan11 Jul 2025 10:12
As previously indicated in remarks by the CEO, they appear to be working on a timeline of approximately 12 months from licence award for first production in Q3 2026. First of the wells proposed for drilling in Q4 this year (well locations not finalised).
Extracts from CPR, based on analysing the company's unpublished development plans.
"Helium One plans to use Electric Submersible Pumps (“ESPs”) in their subsurface production wells. These pumps are designed to deliver 20,000 bbl/d of water. ... If the wells are far enough apart, the model indicates that the liquid rate does not decrease with time—it remains constant at 20,000 bbl/d per well. Helium One models a low case at a lower initial liquid rate, 12,300 bbl/d, which decreases with time."
"Five production wells are planned for the EPS, with drilling to commence in Q4 2025. Helium One has advised that there is an onshore drilling rig ready to deploy, and that each well would require 4 to 6 weeks for sequential drilling. Sproule ERCE considers this a realistic estimate for drilling time based on onshore drilling benchmarks. On this schedule, all five wells are expected to be ready before the EPF comes online in Q3 2026."
"The EPS is assumed to operate for six months before the full development project is commenced. FID for the full development is assumed to be taken at the end of December 2026, with drilling for the full development commencing in February 2027 and the full CPF coming on stream in November 2027"