RE: Quarterly results28 Jun 2025 18:05
After the Stroud meeting I was quite exhausted, there were a lot of new people it was very enjoyable. I’ve never been asked so many questions.
It’s been a bit of a week with Stroud taking most of my time but lots has happened.
ASX
Ernest Giles with Paddysat finding those 30 new pads on Meadows.
Teague with Paddysat finding more pads.
Landtracker maps picking up that Ggp has applied for a huge swathe of land some that the Rio jv surrendered. Half of Telfer Domain and half of Strickland plus a lot more.
Well only a few days of this quarter remains with 91 days of processing possible whereas last quarter only had 78. I shall be disappointed with anything under 100koz but Shaun did say temper your expectations.
Stage 7 was suppose to be where most of the ore is coming from but the satellite images aren’t showing conclusive evidence of that. The great photo of the blasting is at the top of stage 7 so it is happening but most is the ore seems to be coming from the base of the pit. There is a very high grade zone at the northern end of West Dome pit base above 2g/t but the benching needs to go back to get at most of it.
We have an under utilised hoist, this is the target for the next couple of quarters to part fill that hoist and the A reefs quality should do that. The A70 reef had an intercept 2.2m at 16.9g/t and 12.21% copper, that is phenomenal grade. Now I know I’ve said in the past ignore the high sections at Havieron but this reef is constrained, this ore when on the ROM pad will help to keep the head grade up above 1.5g/t for a while. Could be 20koz and 5kt of copper in that small section.
Still got loads I could say but will leave it there for a while.
🙂🚀💰