RE: Telfer - Havieron Gold Mining Project : Revision 1.1 30 March 202310 Sep 2023 07:46
Well for all those with the wrong PDF they’re referring to a table 7-3 on page 136 or there’s a graph on page 135.
This is not necessarily what’s definitely going to happen.
It’s not telling the whole story.
They have just looked at electricity generation for ore processing.
Look at the spike in diesel generators below it and then the huge spike in diesel for transport.
As I’ve been mentioning before getting to the ore in H1 24 is not the start of production there’s another 500m of Decline to get down to the production level plus the access drives and infrastructure to get to the production stopes.
Then there’s the work on the stopes themselves.
There’s at least 6 months of work on that but if the main Decline does accelerate to a Byrnecut record we could reach the ore by this Xmas, which see stoping commence in H2 24.
This ore will be stockpiled near the box cut it’s likely to be a big pile.
I think the Rom pad could take about 125,000 cubic metres bulked but unlikely to get that full.
Not sure of the bulked amount on a road train depends which one they use but about 30-50 cube, 10 trips per day would need 500 cube per day so you would need a big pile to start with.
Going back to the Decline reaching the ore remembering the layout is changing but the old one shows exploration drives going into the ore body, this is called development ore/ ounces and will also come from the access drives.
This ore I’m expecting to go to Telfer as sample loads to test the train circuit for optimisation, this will be H2 24.
The diesel generator spike looks to be for the ventilation and crushing operations as it’s a consistent amount , the previous amount is for the site amenities. This is shown in 2024 so production according to this has started.
Now there is a huge spike in transport diesel consumption this is to get the ore to Telfer in 24.
When it gets to Telfer it will be stockpiled again before going into the ball mill, this may start the latter part of 24, this document has played conservatively and stated 25.
Once the Decline reaches the ore body so long as the mine conforms to H&S laws they will want to get that ore out,
It will be a slow build up during 24 and ramping up in 25.
Once the ore is stockpiled on the ROM they will want to get it to Telfer so long as there’s enough for the transport contractor.
Once it’s at Telfer they will want to process it as long as the stockpile is large enough to keep the process continual.
The key to all this is getting the Decline to the ore hopefully by Xmas