RE: Newcrest Leftovers Don’t Appeal to Australia’s Top Gold Miners - Bloomberg10 Aug 2023 06:56
Hi Malva
I can see you still don’t really understand what I was comparing but I won’t keep going on about Cadia, it is a different beast to Havieron.
I agree about the SLC and it has been mentioned by Newcrest to use this method under the head wall of the Dyke next to the SLOS Western front operation.
You can see that intention by including 3% waste/ dilution of paste fill onto the 6% waste/dilution of the ore.
You can also see this intention by keeping all the infrastructure out of this area in the 3D graphics.
This operation certainly can’t start until the SLOS is way down out of the way and the paste fill cured enough.
Your comment re bulk cave and SLOS can’t happen simultaneously is incorrect for earlier plans, this was definitely the case when they were thinking that the Eastern Breccia was separate.
Once the Decline reaches the underside of the SLOS it will go across to the underside of the EB and the 2 operations were to be simultaneous.
Things moved on from there as the gap zone then became the link zone, being linked puts a different perspective on that plan and we haven’t heard the results of that .
The EB of course keeps going lower so there may be a lower phase of bulk caving below the original plans. They can’t do it all in one, their patent design has a 750-800m limit.
Going on to the Northern Breccia, this bulk cave operation here will be the last thing to happen as you said about the disturbance.
The high grade pods found in this area recently looks as though the plans are still in process for which method to go for. I believe the problem with water coming into the Decline will hinder a bulk caving plan to the NB, this is one of the reasons that SLOS is still in the frame for the centre.
The presentation told us the plans for this are still in planning, when Shaun said it still undecided which method to use.
The EB bulk cave plans are still a long way from being definite until more underground drilling is completed.
The PFS start date of 2028 can’t happen it will be later, so when it does start the SLOS and SLC operations will be way in advance but the lower sections should run in tandem with the EB.