Ryan Mee, CEO of Fulcrum Metals, reviews FY23 and progress on the Gold Tailings Hub in Canada. Watch the video here.
I know DMG, very well, better than most on this board. Never seen TUV, testing centre, be a public record if so.
The link to the Eu, data, see previous post, evidence of just how far away HUI, is from bringing DMG, to market.
HUI, tried to bury the actual true timeline DMG, Poland, and maybe got away with market manipulation, maybe the prospectus didnât mislead and was acceptable to not tell the market was no way to sell DMG, without conformity? What we do know is that they signed agreement almost a year ago to redesign DMG, or produce design that meets conformity criteria and are reasons they decided to not divulge.
What we do know is that Engsolve, didnât meet conformity criteria, or couldnât? What we know is that having tested a prototype years & years ago DMG, isnât even available to sell in the Eu, or UK, market and basic engineering challenges are not yet met.
Gravy train.
Piltick, in-order to sell anything over 50volts? in the Eu, there are strict compliance criteria? Surely havenât forgotten the Eu, CE, and no I dont refer to China Export.
https://europa.eu/youreurope/business/product-requirements/compliance/technical-documentation-conformity/index_en.htm
The technical documentation provides information on the design, manufacture, and operation of a product and must contain all the details necessary to demonstrate the product conforms to the applicable requirements.
If you are the manufacturer, there are certain rules that must be followed when placing a product on the market; you must:
prepare the technical documentation before placing a product on the market
ensure the technical documentation is made available to the market surveillance authorities (should they request to see it) as soon as the product is placed on the market
keep the technical documentation for 10 years from the date the product is placed on the market (unless explicitly specified otherwise)
The technical documentation is necessary to prove the product meets the essential requirements and therefore justify and support an EU declaration of conformity. You need this documentation in order to affix the CE marking to the product.
How to draw up the technical documentation?
Come back soon. Decent profit on exit?
https://www.moroccoworldnews.com/2022/04/348087/moroccos-phosphate-exports-nearly-doubled-in-february-2022
Phosphate exports registered the fastest annual growth rate across the board, going from MAD 7.2 billion ($??741,0 million) in 2021 to MAD 14.2 billion ($ 1,46 billion) a year later, according to data from the Exchange Office, Moroccoâs trade watchdog.
Seaflat, any idea that DMG, was seen in its glory five years ago? When was the Chester event, I admit was that long ago Iâve forgotten exact number of years. I even have a T-Shirt from the event., genuine fanboy, any of todays fanboys have PHE, T-shirt?
And we told a year to fine tune and that included feed stock. Now we obtain wasnât fit installation into the Eu, although that was obvious, yet, a lot of money was raised by a company connected big shareholders PHE, without telling any one. Serious believe this instills competence in the market next big fund raiser when Eu, grants/loans donât materialise?
We are also waiting on the commercial DMG, UK, approved machine, thank goodness UK, exited the Eu, be stuck another few years awaiting conformity approval.
We were told that there is no more development in the design as a drawing/concept, that only a practical version, PHE, must build a DMG unit, only a operational commercial unit could bring the DMG, forward therefore Seaflat, itâs you must be that âŚ. You have no idea where PHE, is in the development stage.
This board is full of what makes the gravy train rich & investors poor.
HUI, went and raised funds knowing that DMG wasnât a design conformity to Eu, standards and was anything of that i. the prospectus? Any idea the amount of testing DMG, does require before able to sell a single unit?
Some dangerous people here misleading those out of their funds Swazers, that what you be doing. DMG, require TUV approval before sale within Eu. And HUI, should known this and should be in the prospectus? Almost a year, and HUI, final admitted, at least in a indirect way.
Swazer, your in too deep, no objectivity on the investment, you bury by way spamming this board. Sure youâre not Paul Warwick?
A year ago, HUI, released DMG, wasnât good enough for Eu, conformity. They took there time telling us all? Surely misleading?
Next HUI, be signing agreements in foreign countries outside Poland without in-country legal advice. What, they already are? Oops.
Engsolve, were suppose to be the end all & be all of DMG, no where have we read that further improvement was or is requirement before commercial unit?
Almost a year ago they admitted via HUI, that the DMG, chamber required further development? And only released that today! Surely misled the market? No wonder PHE, keep their mouths closed and not a word from them?
What about the RNS, from PHE, these long lead items that they announced were on order? Again, have they misled? I knew was something wrong, the very lack of specifics and general statements is a huge red flag, and if fanboys cannot read that the DMG, system isnât ready, well, thatâs a fanboy.
12 months next month and will we read of an update? Another 12 months and no development? And where improvement gained are these to be shared with Engsolve?
Guarantee that Linde, ainât working on this at no cost, yet, no mention of?
Who is really in charge of DMG, development? From reading itâs no longer PHE, nor Peel, and HUI, running away with the license? Once theyâre bankrupt, out of cash, the reset begin, all lose your investment? Latter I do want to be wrong.
Westie, glad you donât believe. I only put forward wasnât impossible. Rather than itâs probable or improbable. No law prohibits the idea of debt only deal that isnât attached to release of additional shares.
Yes, the question we all want answered, in-order relieve the tension of the wait ahead. A solution hereinafter.
Given we all expect zero material news during this time of Ramadan, may I suggest an entire month of Kim Wilde, the cocaine free Blondie. ;)
Keep me Hanging on, and such like classics mixed with some new songs on Kimâs official channel, like and subscribe.
https://youtu.be/xJZF-skCY-M
Give it enough time even all that water that flowed out of Badile, Milan, well be worth millions?
Someone now saying the empty holes in the ground are now a valuable resource to be used as gas storage? Gets better & better this energy crisis.
Ice Land the freezer centre havenât upped the cost their one pound meal deals. I switched the electric off a long time ago, visit the library charge my massive 5kw lithium battery, shower at the gym (off peak membership) what crisis?
Just expect dilution, the big question and one that holds back the sp. Not impossible the situation of all debt no share equity?
Time will tell.
Linde, arenât working for free, they get paid.
Seen this released today.
UI to enhance Electron's chemical conversion chamber design and integration
Hydrogen Utopia International LC (AQSE:HUI), a company pioneering non-recyclable waste plastics to hydrogen technology, in May 2021 commissioned Electron Thermal Processing B.V. ("Electron") to design a chemical conversion chamber which will comprise the heart of an HUI waste plastic to hydrogen facility. HUI has recently tasked Linde Engineering to provide engineering guidance and advice by assessing the interfacing of the kiln and synthesis gas designs. Where necessary or desirable, improvements will be suggested to enhance the potential performance, longevity and/or integration of a complete HUI waste plastic to hydrogen facility. Furthermore, Linde Engineering will help facilitate the fabrication and commissioning of a fully integrated HUI waste plastic to hydrogen plant.
The conversion chamber isnât âgood to goâ does require more research & development? Now almost a year into the contract and no news that the chamber design be ready? Didnât DNL, appraise itâs design without public fault or specific release that improvements are needed?
This is why I decided start asking questions and found no substantive answers. Gravy train.
https://www.independent.co.uk/news/uk/politics/energy-strategy-wind-turbines-grant-shapps-b2049866.html
âThe energy strategy â due to be finally unveiled this week â should âlargelyâ reject onshore wind for those âreasons of environmental protectionâ, Mr Shapps told Sky News.â
Where are PHE, in this strategy? Peel, should be shouting for a special grant or loan?
The RNS, Piltick. Only applicable to HUI.
12 November 2021
âThe framework agreement provides Linde Engineering with a five year exclusivity to supply HUI in HUIâs development of Powerhouse DMGÂŽ technology particularly in Poland, Hungary and Greece where HUI holds exclusivity for promotion and marketing of DMGÂŽ technology and potentially on the wider European Continent on a project by project basis. It permits Linde Engineering at their discretion to engage on any individual project, from equipment supply through to design and build, and, subject to Chemical Thermal Conversion Chamber supply approval, to a full EPC in the areas of the European Economic Area on any HUI developed project.â
The Linde group deal is that Linde, get first offer on building DMG, exception of the conversion chamber, that to be separate agreement if when PHE, agree to release the design.
All the IP is held between Engsolve & PHE.
There is no team, only that Linde, get first offer & they have to offer at competitive rate. Although they know the front end cost of the DMG unit therefore shouldnât be a problem?
Feb/Marchâ completion of the Protos Grid substations to import and export electricity at Protos to the regional grid. This will also give Protos the ability to provide power to occupiers at Protos. This will enable 50MW of export capacity and 6MW of import.
Have we progressed? Is this electrical cable installed? Maybe send Swazers into the site he is good at burying things :)
DMG, does require a technical endorsement that itâs not incineration and the likes of Alex or Howard, I doubt cut the mustard. If DNL, came forward or Sweco, found an approved institution that most certainly set my mind at rest.
All provided the Eu, accepts the validation?
Article 8
Scope of support
1. The JTF shall only support activities that are directly linked to its specific objective as set out in Article 2 and which contribute to the implementation of the territorial just transition plans established in accordance with Article 11.
2. In accordance with paragraph 1, the JTF shall exclusively support the following activities:
(a)
productive investments in SMEs, including microenterprises and start-ups, leading to economic diversification, modernisation and reconversion;
(b)
investments in the creation of new firms, including through business incubators and consulting services, leading to job creation;
(c)
investments in research and innovation activities, including by universities and public research organisations, and fostering the transfer of advanced technologies;
(d)
investments in the deployment of technology as well as in systems and infrastructures for affordable clean energy, including energy storage technologies, and in greenhouse gas emission reduction;
(e)
investments in renewable energy in accordance with Directive (EU) 2018/2001 of the European Parliament and of the Council (17), including the sustainability criteria set out therein, and in energy efficiency, including for the purposes of reducing energy poverty;
(f)
investments in smart and sustainable local mobility, including decarbonisation of the local transport sector and its infrastructure;
(g)
rehabilitation and upgrade of district heating networks with a view to improving energy efficiency of district heating systems and investments in heat production provided that the heat production installations are supplied exclusively by renewable energy sources;
(h)
investments in digitalisation, digital innovation and digital connectivity;
(i)
investments in regeneration and decontamination of brownfield sites, land restoration and including, where necessary, green infrastructure and repurposing projects, taking into account the âpolluter paysâ principle;
(j)
investments in enhancing the circular economy, including through waste prevention, reduction, resource efficiency, reuse, repair and recycling;
(k)
upskilling and reskilling of workers and jobseekers;
(l)
job-search assistance to jobseekers;
(m)
active inclusion of jobseekers;
(n)
technical assistance;
(o)
other activities in the areas of education and social inclusion including, where duly justified, investments in infrastructure for the purposes of training centres, child- and elderly-care facilities as indicated in territorial just transition plans in accordance with Article 11.
Additionally, the JTF may support, in areas designated as assisted areas for the purposes of points (a) and (c) of Article 107(3) TFEU, productive investments in enterprises other than SMEs, provided that such investments have been approved as part of the territorial just transition plan based on the information required under point (h) of Article 11(2) of this Regulation. S
I laugh Moomins, that was funny. The guy that replied is from the Eu, he is an expert. The local administration could misinterpret the JTF, criterium.
I wrote to the chap again for clarification if he hadnât mentioned incineration there be no confusion?
Also asked if the technology wasnât proven could be eligible JTF, funding?
https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32021R1056 https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:32021R1056
REGULATION (EU) 2021/1056 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 24 June 2021 establishing the Just Transition Fund.
Now I maybe read this there perhaps a clue somewhere?
This section reads very good in PHE favour.
â8)
Transitioning to a climate-neutral economy is a challenge for all Member States. It will be particularly demanding for those Member States that rely, or which until recently have relied, heavily on fossil fuels or greenhouse gas intensive industrial activities which need to be phased out or which need to adapt due to the transition towards a climate-neutral economy and that lack the financial means to do so. The JTF should therefore cover all Member States, but the distribution of its financial means should focus on those territories that are the most affected by the climate transition process, and that distribution should reflect the capacity of Member States to finance the necessary investments to cope with the transition towards a climate-neutral economy.â
This paragraph hereinafter the official quoted. The interpretation could be that DMG, encourages less recycling of waste. However, PHE, never targeted that waste only non recyclable materials. We do really require confirmation from those whom assess each application? When we have we have certainty that least DMG, when proven commercial capable meeting full JTF criteria. Meet the criteria in one country, quids in within entire Eu.
(12)
This Regulation should identify types of investments for which support of expenditure by the JTF would be permitted. All supported activities should be pursued in full respect of the climate, environmental and social commitments and priorities of the Union. The list of investments should include those that support local economies through stimulating their endogenous growth potential in accordance with the respective smart specialisation strategies, including sustainable tourism where appropriate. Investments need to be sustainable in the long-term, taking into account all the objectives of the European Green Deal. The projects financed should contribute to a transition to a sustainable, climate-neutral and circular economy, including measures that aim to increase resource efficiency. Waste incineration should not receive support given that this activity belongs to the lower part of the waste hierarchy in the circular economy
Yes, well spotted itâs not incineration, no burning takes place.
Read this part again.
NB. âUse of waste in energy production it is not eligible under Article 7(g) of the ERDF and Cohesion Fund Regulationâ ERDF = European Regional Development Fund.
Iâve requested clarification on the matter & explained the technology doesnt incinerate material. Also explained the DMG, process.
Does appear that if they chucked coal into a DMG, then would be eligible JTF?
That makes Eu, sense. Cannot turn a dirty diaper or plastic bag into energy but if you did it out the ground divert from a coal fired power station itâs ok.
https://ec.europa.eu/regional_policy/en/funding/jtf/
The Just Transition Fund (JTF) is a new instrument of the Cohesion Policy 2021-2027, as the first pillar of the Just Transition Mechanism in the context of the European Green Deal aiming at achieving the EU climate-neutrality by 2050.
The JTF supports the territories most affected by the transition towards climate neutrality to avoid regional inequalities growing, in line with EU cohesion policyâs aim to reduce regional disparities and to address structural changes in the EU.
The fund alleviates the socio-economic costs triggered by the climate transition, supporting the economic diversification and reconversion of the territories concerned, helping people to adapt in a changing labour market. This meansbacking the activities that are directly linked to JTF specific objective, for instance:
productive investments in small and medium-sized enterprises
research and innovation activities
environmental rehabilitation
clean energy
up- and reskilling of workers
job-search assistance and active inclusion of jobseekers
transformation of existing carbon-intensive installations when these investments lead to substantial emission cuts and job protection.