We would love to hear your thoughts about our site and services, please take our survey here.
Thank you for your question and your interest in the Just Transition Fund.
All projects funded by the JTF must support activities that are strictly linked to the JTF specific objective and contribute to the implementation of the Territorial Just Transition Plans (in line with Article 8(1) JTF Regulation). The project selection criteria are defined by the Managing Authority – in the case of the Wielkopolska Region, the Marshal Office of Wielkopolska.
Use of waste in energy production it is not eligible under Article 7(g) of the ERDF and Cohesion Fund Regulation. Waste incineration is at the bottom of waste hierarchy and if overcapacities are created, this will jeopardize transition towards the circular economy. In the spirit of EU strategies and the EU waste hierarchy, one should strive not only to increase the level of separate waste collection and recycling, but above all to prevent waste (zero waste). This calls into question the advisability of investing in new waste incineration plants.
We hope that answers your question.
Kind regards,
I deleted the name.
Programme Assistant
I’ll reply and explain its not incinerator.
Piltick, always possible in the cave (dark space) of a loss given fall PHE sp, that people forget facts play a majority part in why a share be where it is (sp) and sometimes facts take a while to grip the market?
Nuts really that no one funder be throwing money at DMG?
What be wrong how dare they doubt us all with their cookie cutting rules of investing?
There is actual work taking place at the mine site. I’ve wrote numerous times that EML, are not idle, they are physically at work on-site. Plenty to do before issue of any final permit.
Very good update, plenty there to reenforce what we already know and some extra.
As ever not everyone’s cup of tea. Be prepared Ramadan is soon upon us and we shouldn’t expect any news. However, plenty of works to complete at the mine. Include local publicity to bring some cheer those hard pressed people.
You disagree? Rather none statement Piltick?
Let me add.
We are currently 18 months minimum away from a commercial DMG unit. Only company capable is Peel & PHE.
HUI, are chasing loans and grants for what? A machine that doesn’t exist, fact! Minimum of 18 months away? What we require from HUI, is the specifics of the criteria of the loan & any grant? And whether both be legally combined? Without a proven machine HUI, cannot gain from the necessary category and reliant upon “research & development” or perhaps “innovation”. They don’t have an actual DMG, unit to that want a lender to agree?
Then to justify to a Local Authority, who must also invest in an unproven DMG machine? Nothing at HUI, exception of SWECO & Linde, latter cost nothing at the moment, nought adds up?
The money raised been better spent in the direction of Peel NRE, concentrate on one project and get the one project finished rather than this spasmodic approach that may end up with nothing? The grants and loans available in Poland, will dry up very quickly.
Sooner we obtain some data published by SWECO, least prove something be happening the better?
All reeks of gravy train.
Piltick, my point exactly? HUI, haven’t stipulated anything except ten DMG units? No phased approach?
1) no movement at protos. fact
2) no movement Scotland. fact
3) HUI, only the funds to gain planning. fact
4) no long lead items ready. fact
5) August deadline for Peel. fact
6) No plan B if August deadline not met. fact
7) DMG, workable technology. fact.
I wrote back in January to the replies of the usual who tried to deride the permit perhaps won’t happen until after Ramadan. That is now certain.
I wrote to EML,to ask when they expect to comp,etc the previous issued contracts and as yet no reply. My view now is that we must wait until these contracts the works associated become,eye before we see a permit.
The ecological issues raise although put very eloquently are anon issue there just isn’t a environmentalist movement that goes for all Africa.
The question of recycling water if that what T try’s to hide from such indirectness we must take that EML, will do the RIGHT thing and in their plan water win’t be discarded to mere feed crops nearby agricultural fields.
Africa isn’t the joined up union such as the Eu, they have a long way to go before such detail as so put by T be mandatory.
The rise in the SP, only now to drop, MMs creating a market before locking in a few on the high price & the long drawn out month of most accept nothing will happen. Those whom bought it is you that help this share go higher quicker when the permit final announced.
Filter is a great idea Mr Anomaly.
Answer your question about investing within PHE, again having sold from the sub penny days the answer is yes.
Not once have I doubted DMG.
HUI, subsidiary applied 17 million Euro grant that if successful only cover one machine? They then require Just Transition funding if that's not barred from winning the 17 million? And from that 17 million Euro the JT fund is maximum 75 percent total funding requirement?
Most certainly a gamblers paradise? Why not just raise funds on the Warsaw stock exchange? HUI, surely have a plan B or C?
Will phone West Dunbartonshire Council tomorrow and enquire about planning stages DMG, Scotland.
NB. I know plenty of Polish people. Maybe ask one to try and obtain something bit more solid than what we are being offered by HUI.
Great read there. Have you the address of these alleged ten DMG plants?
Surely must be space next to the municipality dump or wherever they process the garbage? Why the big mystery HUI?
Been to Morocco Taipan? There is no shortage of water in that the rains are seasonal and even in the desert snow is known to fall.
I posted something on this topic while ago. The World Bank had identified a need several years past that Morocco must expand its water reserves (build lakes) in numbers and that indeed they have done and are doing.
The very fact there is no water table at the mine is ti our advantage. Water be pooed into the site normal as like everywhere else these days.
I'd say Morocco has less of an issue than Spain and recent press are hailing Morocco to be a new agricultural foid growing centre. Obviously no problems with water.
Morocco isn't short of water from the sky. Only liw in number of lakes to store that water, and each few years more are built. And more lakes equals more ground water.
Was searching out Kolin, Poland, unless be another Kolin, it’s a village with 529 people? Ten DMG, units middle of no where? That I admit cannot be correct?
Web address and any problems I will guide through the planning portal see link hereinafter. You guys should shut me down with solid facts rather than insults, no wonder the sp is dropping. However, always a bonus to some? I’ve never said anything negative on the technology of DMG, seen DMG, function several years ago. The aggression from many is pure ignorance.
https://apps.west-dunbarton.gov.uk/dcdisplayfullx.asp?vUPRN=DC21%2F217%2FFUL&vPassword=&View1=View
Live application.
Please note that any comments made on planning applications may be published on the Council internet site as they form part of the public record. The e-mail address and telephone number will not be published.
Reference Number: DC21/217/FUL
Address of Proposal: Vacant Land At Rothesay Dock Dock Street Clydebank
Proposal: Development of a Plastics To Hydrogen Facility, Hydrogen Vehicle Refuelling Station and Associated Infrastructure and Landscaping
Type of Application: Full Application
Development Type: Local Development
Status: Pending Consideration
Officer: Ms Amy Melkevik
Date Received: 10/08/2021
Date Valid: 10/08/2021
Decision Date:
Committee Date:
Appeal Status: N/A
Applicant Name: Peel NRE Limited
Applicant Address: Venus Building, 1 Old Park Lane, TraffordCity Manchester England M41 7HA
Agent Name: AXIS PED
Agent Address: Unit 11 Well House Barns Bretton Chester CH4 0DH F.A.O Laura Mackey
Ward: Clydebank Waterfront
Community Council: Clydebank East
https://apps.west-dunbarton.gov.uk/dcdisplayfullx.asp?vUPRN=DC21%2F217%2FFUL&vPassword=&View1=View
Live application.
Please note that any comments made on planning applications may be published on the Council internet site as they form part of the public record. The e-mail address and telephone number will not be published.
Reference Number: DC21/217/FUL
Address of Proposal: Vacant Land At Rothesay Dock Dock Street Clydebank
Proposal: Development of a Plastics To Hydrogen Facility, Hydrogen Vehicle Refuelling Station and Associated Infrastructure and Landscaping
Type of Application: Full Application
Development Type: Local Development
Status: Pending Consideration
Officer: Ms Amy Melkevik
Date Received: 10/08/2021
Date Valid: 10/08/2021
Decision Date:
Committee Date:
Appeal Status: N/A
Applicant Name: Peel NRE Limited
Applicant Address: Venus Building, 1 Old Park Lane, TraffordCity Manchester England M41 7HA
Agent Name: AXIS PED
Agent Address: Unit 11 Well House Barns Bretton Chester CH4 0DH F.A.O Laura Mackey
Ward: Clydebank Waterfront
Community Council: Clydebank East
Some of the posters around here remind of Paul Warwick. He at the time many years ago was a huge shareholder and often go into a frenzy when anyone posted a critism or posted that what displayed the actual reality PHE.
Recall he telling all that never sell PHE, only to sell and buy a car if memory serves correct? He did sell after misinformation to the market. Believe he had to give up posting after that. But you never know, easy create a new name or several.
Anyone know where the HUI site be located? Off now try and find some data on the PHE site Glasgow or is it in Dunbartonshire council's area? Later.
Firstly why are those off topic posts with another stock tagging that to Audioenergy? I'm here to discuss HUI and PHE, not mentioned any stock outside of those two?
Mr Anomaly, are well aware the situation of grant aid as far EU concerned you didn't address the specific nature of the technology and at what stage in its development will be at when the grant application is made. That a crucial area skipped.
They ain't going to gain grants fund ten DMG units if Peel, unit isn't fully operational and validated commercial. Until then it's "innovative" at best if that category could allow.
Cannot apply grant aid on an untested machine within its fully tested category.
All have some cheek labelling myself those derogatory remarks. All typing to your mirrors.
Once the technology DMG up and running and proven I doubt any customer bother about the development stages.
They want their trash got rid of and if DMG does what it says on the tin, that is all customers care about.
For clarity I wrote to the Eu commission address via JT, website and asked if unproven tech could be considered? Coherent enough for all?
Getting the a local municipality to agree to forward your grant application and getting it accepted is two different strings on a bow. Municipality is desperate and not best objective any situation.
Maybe fund one unproven DMG, unit under terms of "innovation" but not ten. And the big established players in the area -see a previous post, link to one- they will get first bite at everything.
Any funding will be quick swallowed up.
"each should be coherent" What be a coherent project? Without a commercial proven DMG , unit operational we must get the fine detail to the terms and conditions and grant application?
Toyota, agreement still alive?
https://www.pv-magazine.com/2022/03/28/toyota-develops-new-module-to-store-transport-hydrogen/
https://www.reddit.com/r/next****inglevel/comments/j92snj/school_gatekeeper_in_morocco_fixed_and_painted/
I'm not concerned based upon been no delay. If GC hadn't made that comment about "imminent".
The government has never given us a delay from fact no timetable was ever published.
It's my view they want the recent awarded contracts completed before they move forward?
Peel, sitting on the DMG site while getting on with in their words 'proven technology' next door.
No argument about DMG, uk planning only Poland.
Maybe I should check the Scottish site? I'm location not too far away at this moment.
PHE stuck with Peel on an exclusive deal until August 2022 and Peel, work on the (protos) site at their leisure, we will eventual obtain at what speed?
As wrote before I'm with concern Peel, maybe wait until Poland comes through? Poland, maybe in trouble given their government are refusal comply EU, laws and EU could withdraw funding.
There is one thing having a project eligible gain EU, funding, another is actual attainment. I'd prefer some evidence that HUI, polish subsidiary already seen success in its application gain EU, grant aid.
To those allegations chaps stop writing while are looking in the mirror. Testy has long since accepted he is that what he does label. Chao.
Take some material solid news shift this stock. We can but wait.
Nickel anyone?