RE: Share Price21 Feb 2022 12:40
@AG What I'm seeing going through the Dec-21 video, Align analyst report and the RNSs is a strong relationship between operations and finance focused on a strong ROI given their 3 phase Development plan which they seem to be executing on in double-quick time to reduce costs, increase plant/mine capacity, increase resources and %gold recoveries:
(1) fully refurbished existing plant to optimise throughput & reduce potential future outages = Done
(2) Split tailings processing from main processing so independent = Done
(3) Procured second-hand ball mill and refurbishing to increase ROM capacity in existing buildings = WIP
(4) Adding Heap leach plant to process lower grade tailing to increase overall %gold recoveries above 80% = WIP
(5) Driving new Adit to open up already identified additional resources & additional stope from 2 to 3 operational to derisk mining plan and increase available ore = WIP
(6) Proven refurbished plant can deliver target tpd ore processing to enable 1koz/month production = Done
(7) planning to expand current 700koz JORC & implied 30-year LOM with trenching & drilling programme = WIP
(8) Confirmation of connection to grid power reducing cost by $100/oz = Done
Funding: Has anyone got a handle on cash position given initial £4m cash raise Aug-21 and subsequent £2m placing Feb-22? I notice they have an agreed £5m CLN on an 18-month term which speaks volumes to me about the pace at which they intend to execute their plans.
AIMHO ATB APR